Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

City Street Parking Around Site

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Sara Zoumbaris  on 

We are working on a major renovation of 3, connected parcels in a major metropolitan area. Our project itself is including no new parking.

2
Sustainable Design Consulting
LEEDuser Basic Member
20 thumbs up
Tue Mar 22, 2016, 11:29 pm

Reduced Mercury Content

CI-2009 IDc1:Innovation in Design
posted by  Lou Niles II  on 

Hello, We have multiple projects in LEED v2009 for which we could earn this ID Credit and point for but the process of documentation seems quite ridiculous using the EBOM method of "required" or no

2
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Mar 18, 2016, 11:54 pm

Responses to preliminary review comments

NC-2009 EAp2:Minimum Energy Performance
posted by  David Browne  on 

My engineers' submittal for this prerequisite resulted in a lengthy list of comments, with a requirement that a narrative response to each comment be provided.

2
Default Avatar
Architect
CRA Associates, Inc.
LEEDuser Premium Member
5 thumbs up
Thu Mar 17, 2016, 2:48 pm

LEED Project Boundary, Concerned about Future Buildings...

NC-2009 PIf2:Project Summary Details
posted by  Rachel Manoguerra  on 

I registered a utility training center as an individual project on LEED Online, because at the time that was our understanding.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Mar 16, 2016, 3:23 am

Two Commissioning Agency

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Steve Valev  on 

We are documenting a project where a roof-mounted PV system was installed after the building was occupied and the original commissioning process was complete.

3
Mon Mar 14, 2016, 10:22 pm

minimum drawdown rate

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  ethan adams  on 

OK it seems like, from reading the questions and responses here, that there is absolutely no clear guidance on how to come up with the "rainfall interval event" in order to perform the drawdown cal

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Mar 14, 2016, 8:29 pm

Items that are used for either MRc4 or MRc3

NC-2009 MRc4:Recycled Content
posted by  Erika Duran  on 

Dear All, I am unclear about something. If I have items that would qualify for MRc3 but we are not pursuing that credit, is it acceptable to count them towards MRc4?

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 14, 2016, 6:37 pm

Re-commisioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  John Wood  on 

I am a PE who has been approached by a building owner with a request to have the building "re-commissioned." I have designed LEED projects before, and participated in the original commissioning, b

5
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Mar 14, 2016, 6:15 pm

NC-v4 LTc2: Sensitive land protection/Wetland Protection

NC-v4 LTc2:Sensitive land protection
posted by  Robyn Dowsey  on 

Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 11, 2016, 3:05 pm

Option 2

NC-v4 SSc4:Rainwater management
posted by  henry nguyen  on 

Hello, I wonder how should I understand Opt.2 BD+C Rain water Mgmt credit. "Manage on site the annual increase in runoff volume from the natural land cover condition to the post-developed conditio

4
Thu Mar 10, 2016, 4:25 pm