Forum quick links
Metered Faucet: Max GPC or Flow Rate x Duration?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Christian Kaltreider on
Hello, My project will use metering handwash faucets at the lavatories. The flow rate is 0.5 gpm.
Case 2, Option 1 - how many different support programs required?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Erica Downs on
There is a thread below (started April 2013, subject line: Mixed use
submetering general requirements and strategy for metering HVAC
CI-2009 EAc3:Measurement and Verificationposted by Rob Pinkston on
Hello, We are working on a low-rise office building and pursuing LEED CS v2009 for the base-building and LEED CI v2009 for at least one of the tenant spaces.
Adhesive credits
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Patricia Taylor on
As a Flooring contractor, I get many customers that request we submit LEED information many different ways. A couple have asked that I break out the qty and total material cost for adhesives.
Definition of one building
NC-2009 PIf2:Project Summary Detailsposted by Cindy Quinn on
What is the definition of one building? Specifically, how much connection between two building portions must there be in order for LEED to consider it one building?
Option 2 for LEED CI EAc1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Alan Li on
I'm working on a project that pursues the CI EAc1.3 credit by following Option 2 using ASHRAE 90.1-2007 Section 11.
Innovation Credit for Core and Shell v2009
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by José Solis on
I have a Core and Shell v2009 project. I've seen that a number of people have been using this credit as an ID credit for NC projects. Is it safe to assume that we can use it for CS also?
City Street Parking Around Site
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Sara Zoumbaris on
We are working on a major renovation of 3, connected parcels in a major metropolitan area. Our project itself is including no new parking.
Reduced Mercury Content
CI-2009 IDc1:Innovation in Designposted by Lou Niles II on
Hello, We have multiple projects in LEED v2009 for which we could earn this ID Credit and point for but the process of documentation seems quite ridiculous using the EBOM method of "required" or no
Responses to preliminary review comments
NC-2009 EAp2:Minimum Energy Performanceposted by David Browne on
My engineers' submittal for this prerequisite resulted in a lengthy list of comments, with a requirement that a narrative response to each comment be provided.