Do Diverse Uses Still Need to Be Publicly Available?
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Vanessa Nelson on
LEED NC v4.0 says diverse uses need to be available to the public. I don't see that language in the v4.1 reference guide. Was that requirement dropped?
If this Pilot Credit is pursued as an ID credit under initial ID+C certification, can Green Cleaning also be pursued?
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Susan Di Giulio on
If this Pilot Credit is pursued as an ID credit under initial LEED-ID+C v4 certification, can Green Cleaning (as part of the O+M Starter Kit) also be pursued?
Light Pollution for Large Project Boundaries
Warehouses-EBOM-v4.1 SSc3:Light Pollution Reductionposted by Rick Fox on
I manage a 550k square foot warehouse operating at 24/7. All of our building lights, are LED and point down at the ground. Our pole lights are LED also and point down at a 45 degr
Lighting Control - Recording Studio
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After
Patient Rooms
Pilot-Credits WEpc147:All-Gender Restroomsposted by Vanessa Hostick on
Does anyone have experience documenting this pilot credit on a hospital? It's unclear if the patient room should be included or excluded from the documentation and count.
Future medical office building - views methodology
CS-v4.1 EQc5:Quality Viewsposted by Jeremy Shiman on
We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB.
How do I calculate the total runoff, if I am required to send rainwater elsewhere?
EBOM-v4.1 SSc1:Rainwater Managementposted by Rick Fox on
I have so many questions concerning storm water management. My company is a large warehouse. We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 sq
Averaging Facility Rates over Time
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick on
The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility.
Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Nikhita Sapuram on
Most WBLCA software programs do not include product specific data.
Schedule for Data Center Load
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?