Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

HVAC Zoning & Controls

CI-v4 EAc2:Optimize energy performance
posted by  Vicki Rybl  on 

The base building for my project is an odd shape and there are a few zones which touch two building walls (for example, a conference room has one window which faces west and three windows which fac

1
Wed Nov 16, 2016, 5:54 pm

Calculating material use for mock-ups.

NC-2009 MRc4:Recycled content
posted by  Peter Doo  on 

When working on large projects with substantial mock-ups, should one include these materials in the project documentation?

1
Sat Sep 12, 2015, 12:10 am

Total Site Area within LEED Project Boundary

NC-2009 PIf2:Project Summary Details
posted by  Sara Goenner Curlee  on 

I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?

1
Fri Feb 10, 2017, 9:38 pm

simple box model

NC-v4 IPc1:Integrative process
posted by  Courtney Royal  on 

how do you define a simple box model? for example, do you need to model thermal zones, etc.

1
Wed Apr 26, 2017, 2:01 pm

Summary marked "N"

NC-2009 PIf3:Occupant and Usage Data
posted by  Ryan Kurlbaum  on 

We have completed this form and for some reason continue to have the "summary" box marked as "N".

0

Used Furniture with Recycled Content

CI-2009 MRc4:Recycled content
posted by  Kristine Byers  on 

Our project is a TI which includes the renovation of several floors of a corporate office building. The tenant is bringing with them a substantial amount of used furniture.

1
Mon Mar 28, 2016, 7:50 am

Mop sink in v4

NC-2009 WEp1:Water use reduction
posted by  Lissa Spitz  on 

Hi, our project is a data center that shares toilets in an adjacent building. The only plumbing fixtures in the DC are a mop sink and eyewash units. Can we achieve the WE indoor prereq?

1
Sat Aug 26, 2017, 1:33 pm

Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?

CI-2009 EAc2:Enhanced commissioning
posted by  Margaret Montgomery  on 

In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?

1
Tue Jun 14, 2016, 9:49 pm

Energy Star minimum area = 5,000sf

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Saul Pichardo, AIA  on 

I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.

1
Tue Apr 7, 2015, 3:59 pm

residential kitchen - spray nozzle

NC-2009 WEc3:Water use reduction
posted by  Erin Holdenried  on 

Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?

1
Thu Aug 11, 2016, 3:36 pm