Forum quick links
HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Vicki Rybl on
The base building for my project is an odd shape and there are a few zones which touch two building walls (for example, a conference room has one window which faces west and three windows which fac
Calculating material use for mock-ups.
NC-2009 MRc4:Recycled contentposted by Peter Doo on
When working on large projects with substantial mock-ups, should one include these materials in the project documentation?
Total Site Area within LEED Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by Sara Goenner Curlee on
I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?
simple box model
NC-v4 IPc1:Integrative processposted by Courtney Royal on
how do you define a simple box model? for example, do you need to model thermal zones, etc.
Summary marked "N"
NC-2009 PIf3:Occupant and Usage Dataposted by Ryan Kurlbaum on
We have completed this form and for some reason continue to have the "summary" box marked as "N".
Used Furniture with Recycled Content
CI-2009 MRc4:Recycled contentposted by Kristine Byers on
Our project is a TI which includes the renovation of several floors of a corporate office building. The tenant is bringing with them a substantial amount of used furniture.
Mop sink in v4
NC-2009 WEp1:Water use reductionposted by Lissa Spitz on
Hi, our project is a data center that shares toilets in an adjacent building. The only plumbing fixtures in the DC are a mop sink and eyewash units. Can we achieve the WE indoor prereq?
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
Energy Star minimum area = 5,000sf
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Saul Pichardo, AIA on
I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.
residential kitchen - spray nozzle
NC-2009 WEc3:Water use reductionposted by Erin Holdenried on
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?