Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

following v4 requirements?

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Erica Downs  on 

Any idea if the v4 version of this credit (MRc1 Building Life-cycle Impact Reduction) could be substituted here? Or maybe pursued for an innovation point?

1
Wed May 13, 2015, 5:25 pm

searching out no voc floor sheathing and mdf

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Phil Vanderloo  on 

I was hoping someone can direct me to a resource, available to Sacramento Ca., for compliant, (no voc or urea formaldehyde), 1 1/8" T&G plywood floor sheathing. Thank You

1
Mon Jun 13, 2016, 12:15 am

renovation and addition: effect on site boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Ramana Koti  on 

Dear all, We're working on a project that renovates a tiny portion (interior fit out only) of an existing building and involves an addition right next to the renovated portion.

0
1
Fri Nov 27, 2015, 4:49 am

School outisde of project boundary

ND-Plan-v4 NPDc15:Neighborhood schools
posted by  Sarah Kearney  on 

The requirements do not specify if the school has to be within the project boundary.

1
Wed Nov 16, 2016, 10:33 pm

Achieving Same Pilot Credit Twice?

Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workers
posted by  Patty Lloyd  on 

Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?

1
Thu Feb 16, 2017, 1:22 am

Total Site Areas

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Dave L  on 

Hi, I am working with a project that is beneath a municipal park.

0

Condenser water

CS-v4 EAc3:Advanced energy metering
posted by  MKK LEED  on 

Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.

1
Mon Aug 28, 2017, 1:45 pm

Onsite Recreation Space

Pilot-Credits EQpc78:Design for active occupants
posted by  Megan Recher  on 

We are working on a new high school and I want to clarify the onsite recreation space.

0

Approach for documentation with 2 Commissioning Agents

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Aishwarya Balagopal  on 

The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.

1
Mon Aug 15, 2016, 9:44 pm