NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Erica Downs on
Any idea if the v4 version of this credit (MRc1 Building Life-cycle Impact Reduction) could be substituted here? Or maybe pursued for an innovation point?
searching out no voc floor sheathing and mdf
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Phil Vanderloo on
I was hoping someone can direct me to a resource, available to Sacramento Ca., for compliant, (no voc or urea formaldehyde), 1 1/8" T&G plywood floor sheathing. Thank You
renovation and addition: effect on site boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ramana Koti on
Dear all, We're working on a project that renovates a tiny portion (interior fit out only) of an existing building and involves an addition right next to the renovated portion.
Bike rentals count towards SSc4.2?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Deborah Lucking on
We have a project that has a number of bicycle rental spots.
School outisde of project boundary
ND-Plan-v4 NPDc15:Neighborhood schoolsposted by Sarah Kearney on
The requirements do not specify if the school has to be within the project boundary.
Achieving Same Pilot Credit Twice?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Patty Lloyd on
Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?
Total Site Areas
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Dave L on
Hi, I am working with a project that is beneath a municipal park.
Condenser water
CS-v4 EAc3:Advanced energy meteringposted by MKK LEED on
Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.
Onsite Recreation Space
Pilot-Credits EQpc78:Design for active occupantsposted by Megan Recher on
We are working on a new high school and I want to clarify the onsite recreation space.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.