Forum quick links
Example of a populated BPDO calculator fro LEEDv4?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jaspreet Pahwa on
Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are noted, compliance is met? Also h
building-height-to-street-width ratio
Pilot-Credits PC14:Walkable Streetsposted by Eric Carbonnier on
How does the building-height-to-street-width ratio promote walkable environments?
Default Tenant Receptacle Loads
CS-2009 EAp2:Minimum Energy Performanceposted by Mary Kay Gonzalez on
On a C&S healthcare building, we simulated the receptacle load based on CS Appendix 2, Table 1, as the appendix directed.
Low Emitting Materials Tracking Spreadsheet
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Patrick Thibaudeau on
Is there a tracking spreadsheet for low emitting materials like there is for recycled content and regional materials.
Phased Flush Out
Schools-NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.
Curtain Wall Should Be Exterior Wall or Glazing?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Sara Zoumbaris on
Is a large curtain wall to be considered as exterior wall or glazing for this credit? Thank You!
Credit Union
CI-2009 SSc2:Development Density and Community Connectivityposted by Neil Rosen on
Would a credit union work as a basic service in place of a bank?
Commingled waste
NC-2009 MRc2:Construction Waste Managementposted by Sundararaj Subburaman on
I have NC Retail 2007 project. The same type of waste is grouped together. For example, the metal includes iron, aluminium and etc, But sorting is done off site.
Commissioning Starting After 50% CDs
NC-2009 EAc3:Enhanced Commissioningposted by Sara Zoumbaris on
I could have sworn there was an LI (LEED Interpretation) discussing / approving a certain scenario where Enhanced Commissioning had been started after 50% CDs and was still acceptable under this cr
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.