Forum quick links
Tenant Sub-Metering
CI-2009 EAc3:Measurement and Verificationposted by Donald Green on
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.
Warehouse with office space
EBOM-2009 PIf3:Occupant and Usage Dataposted by Saul Pichardo, AIA on
I am working on a warehouse/distribution project that has approx. 200,000 sf warehouse/ distribution space with a 6,444 sf office that supports the warehouse operations.
Dynamic Plaque for ID: Green Education
posted by Jennifer Preston on
Has any Project Team achieved the ID: Green Education credit with the LEED Dynamic Plaque satisfying requirement #1: "Comprehensive signage program built into the building's spaces to educate the
Semi-conditioned Baseline requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Michael Ozenich on
I have a heating-only warehouse (with small conditioned office) I'm modeling for C&S 2009.
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Search Bar is Not Accessible
NC-2009 PIf3:Occupant and Usage Dataposted by James Bell on
I have an account, I am logged in, and am using Internet Explorer in Windows 10. Why am I not able to enter anything in the search bar of the Forum?
Multi-Purpose Latex Primer/Sealer
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Stephanie Santiago on
What voc limit would I use for a Multi-Purpose Latex Primer/Sealer paint for use on interior ladders?
WEc1 - We don't really have a "SITE" outside of the building env
Retail-NC-v2009 WEc1:Water efficient landscapingposted by Lou Niles II on
Hello I am working on Two Separate projects that actually overlap on a site; they are not registered as Master Site or Campus and we don't want that at this time. Project A Surrounds Projects B. Pr
Atypical Fixture on a Floor with 0 FTE
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alexis Thompson on
I'd like some assistance on defining my fixture groups. My project has the same public lavs, water closets, and urinal fixtures throughout the building with very similar occupant usage patterns.
USGBC Approved Environmental Product Declaration Framework
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Gary Brock on
It still isn't clear to me what is meant by "USGBC approved environmental product declaration framework" which is applicable for pursuing either option 1 or option 2.