Forum quick links
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?
WELL credits and LEED Innovation points
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Meredith Chambers on
Can a WELL credit be used as a LEED Innovation point in v4? If so, can the list shown in Appendix C, Table A2 of the WELL Building Standard v1 Reference Guide be used to show compliance with v4 Pe
IAQ calculator occupancy designations?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Patricia Andrasik on
I'm working on a dormitory that features 4-bedroom suites that are occupied by 5 people (3 single rooms and one double per suite as well as a living room, shower room, sink/vanity area, and toilet)
Sustainable Purchasing: Durable Goods
NC-2009 IDc1:Innovation in Designposted by Joyce Kelly on
Working on a Warehouse with (4) vending machines, (2) refrigerators. With 24 hr. loads, these seem like good candidates for requring Energy Star qualified products.
Credit compliance using AVR as an alternative metric
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Zane Lichtneger on
I see some formal programs use “average vehicle ridership” (AVR) as an alternate metric. We are active participants with the Go Smart/Go Perks/Triangle Transit/Share The Ride program.
LEED-H Water Use
Homes-v2008 WEc3:Indoor water useposted by Robyn Vettraino on
Is there a tie-in somewhere that requires individually metered homes/units in LEED for Homes?
washer/dryer - what is actual issue, the exhaust or chemicals?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on
We have a project that has a washer & dryer in the corner of a building services room, for periodic/sporadic use.
Documentation for Plan
ND-Plan-v4 GIBp1:Certified green buildingposted by David West on
For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.
Master's Research Survey
Pilot-Credits MRpc61:Material disclosure and assessmentposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati for my Master's thesis in support of my hypothesis.