Unfinished Spaces Baseline and Proposed System
NC-2009 EAp2:Minimum energy performanceposted by Phil Stafa on
Hello: I have a 3 story mixed use healthcare facility with offices, exam rooms, treatment rooms, research areas, and a surgical suite.
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum energy performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
detail information about LEED certified projects
NC-2009 SSp1:Construction activity pollution preventionposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
Fiberglass Wall Panels - GreenGuard Select Education, Healthcare
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
We have Crane Fiberglass wall panels at janitor closets; I assume they should be included for this credit as a 'wall covering'. The product has certifications for Greenguard Select Education and Gr
Elevator Shafts in high rise condo
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Chris Wisniewski on
I am the HERS rater working on a 80+ story condominium high rise. It is intended to be a "smoking permitted" building. Some of the residential units have in-unit access to the elevators.
Can we use the IEQc4.5 Furniture and Furnishings as an ID credit
NC-2009 IDc1:Innovation in designposted by Carmen Vidal-Hallett on
Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.
Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
open grid paving and gravel
NC-2009 SSc7.1:Heat island effect - nonroofposted by Erin Holdenried on
What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.