Forum quick links
Retro-Enhanced Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Christian Pegher on
Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.
MRc4 Recycled Content Calculation
NC-2009 MRc4:Recycled Contentposted by Jack Jennings on
Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?
No Tenant Fit Out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Kimberlyn Caoagas on
I'm working on a 12-story office building. To my knowledge, there are no concrete tenant fit outs yet (since the tenants have yet to be known). Would the project be able to pursue IEQc8.1/8.2?
Car sharing programs for residential
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Kristen Magnuson on
Does anyone know if cars from car sharing programs provided for residents need to be dedicated only to the residents?
The vent calcs indicate a total area significantly lessthan Plf2
NC-2009 IEQp1:Minimum IAQ Performanceposted by Matt Dem on
Hi, I received a comment for (Design Preliminary Submission) ventilation calculations indicate a total area (3,055 sqf) significantly less than plf2 (6219 sqf) for the IEQp1 Our response is; The ar
Average Leed Recycling percentage for a large ground up building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jamie Knoblock on
I was wondering if anyone would know what the average Leed recycling percentage is on a large ground up hospital on a construction site across the united states , thank you.
Basic resource with many uses...
posted by Kath Williams on
Condensed version of LEED-EB: O&M that has proven to be useful in introducing O&M to potential facilities management clients, those just starting LEED-EBOM, and hopefully, will be a bridge
Increasing Baseline Static Pressure for Sound Regulations
Schools-NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
We're working on a project where in order to comply with local noise regulation requirements, the Proposed design required indoor air handling equipment with fully ducted exhaust/intake air connect
Commercial Interiors 2009 v3 - Documentation Reuse and Boundary
posted by CHRISTIAN LUTJEN on
Hi all, We are embarking on our office's first LEED Commercial Interiors project. The existing envelope received 2009 v3 LEED Gold for Core and Shell in 2014.
VOC Content allowed per CA Section 01350
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Elizabeth Matthews on
In processing the IEQc4.1 I am running into products that call out the VOC content, but I do not know the limits that need to be met for CA Section 01350. Does anyone know those numbers?