Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Total Site Areas

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Dave L  on 

Hi, I am working with a project that is beneath a municipal park.

0

Condenser water

CS-v4 EAc3:Advanced energy metering
posted by  MKK LEED  on 

Hi, We are providing condenser water to the floors of a core and shell building for tenant installed heat pumps throughout.

1
Mon Aug 28, 2017, 1:45 pm

Onsite Recreation Space

Pilot-Credits EQpc78:Design for active occupants
posted by  Megan Recher  on 

We are working on a new high school and I want to clarify the onsite recreation space.

0

Approach for documentation with 2 Commissioning Agents

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Aishwarya Balagopal  on 

The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.

1
Mon Aug 15, 2016, 9:44 pm

IAQ management plan-during construction or before occupancy

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Kali Wolin  on 

I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.

1
Fri Jun 17, 2016, 12:42 am

Reopening one path of LEED-CI SSc1.2 in Construction Review

CI-2009 SSc1:Site Selection
posted by  Susan Di Giulio  on 

In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.

1
Tue Jan 12, 2016, 3:32 pm

Construction - Indoor Air Quality V2009

Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Noelle Hunner  on 

Does the indoor air quality credit allow for propane powered lifts (inside the building) during construction? Or do they have to be battery powered only?

1
Wed Jul 22, 2015, 4:38 am

Indoor Water Use Reduction Credit Threshold - 7 pt?

CI-v4 RPc1:Regional priority
posted by  Aaron Dahlstrom  on 

I am considering pursuing the RP point available in Philadelphia, PA for Indoor Water Use Reduction.

1
Tue Jan 17, 2017, 7:42 pm

Amphitheater Occupancy

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Peter Doo  on 

Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.

0

LEED O&M for building additions

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Steve Gross  on 

I am in the process of documenting LEED O&M credits for a museum that is building an addition.

1
Fri Feb 24, 2017, 8:55 am