VOC Limit - Thread Cutting Oils
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jason Biondi on
What is VOC limit for "Thread Cutting Oils" as per SCAQMD Standards to comply with LEED requirements ?
SSc4 Option 5 Delivery Service
Retail-NC-v2009 SSc4:Alternative transportationposted by Brian Coffman on
Regarding SSc4 Option 5 Delivery Service. The client/owner is a department store chain which has a main website that offers shipping for online purchases.
Interior Cross-Contamination Prevention, Industrial Curtain Wall
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Ashley Wisse on
Our project contains a theater scene shop including a small area where spray paint will occasionally be used.
Low Emitting Products
Homes-v4 EQc7:Low-emitting productsposted by Jess Harris on
Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.
Asbestos Abatement
ND-v2009 SLLc2:Brownfields redevelopmentposted by Laura Steinbrink on
Can you comply with this credit if you are removing asbestos?
Changes to Campus Boundary?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by David Gibney on
It was recently brought to my attention that our Master Site (under the older "block" registration process) has changed since our original design intent.
Building Entrances
NC-v4 EQp2:Environmental tobacco smoke controlposted by Johanna Scogin on
We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors.
Never Have Cooling Towers
Pilot-Credits WEpc17:Cooling tower water useposted by Janice Rogers on
We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?
Bank-Financial Institution
NC-2009 PIf3:Occupant and Usage Dataposted by Joseph Blanco on
How would I calculate transit occupancy for a bank. They have 13 FTE.
Future Reclaimed Water Service
NC-2009 WEc1:Water Efficient Landscapingposted by Annalise Reichert on
I am working on a project that is installing reclaimed/recycled water lines to the project, with the goal to offset 60% of irrigation water with recycled water.