Forum quick links
Eligible for Exemplary Performance Credit?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Owen Hyne on
We anticipate meeting/exceeding requirements for SSc6.1 "Quantity Control", but not SSc6.2 "Quality Control".
DDA Boundary
NC-v4 LTc3:High priority siteposted by Trevor Anderson on
Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?
Envelope Categorization
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Russell Philstrom on
Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.
Acoustic Test in the Field
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Holly Van Straten on
I am a manufacturer of HVAC equipment that is installed in a classroom. Due to this prerequisite I get frequently asked if we "meet LEED standards".
If you are already meeting SS c8...
Pilot-Credits SSpc55:Bird collision deterrenceposted by Cynthia Kaplan on
...Then the lighting requirements for SS pc55 should be a foregone conclusion, no?
U-value and SHGC for Baseline Fenestration in ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I am reviewing the residential unit's EAp2 for Hawaii. The U-value and SHGC in ASHRAE 90.1, Table 5.5-1. The title of table (the first raw) says "Assembly Max.
Using interpretation 10203 for a hotel site
NC-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.
Multifamily Buildings
EBOM-v4 WEp1:Indoor water use reductionposted by Zachary Sherman on
For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?
Project has all 5 Categories
Schools-2009 WEc4:Process water use reductionposted by Sara Zoumbaris on
Hi all, My project has all 5 categories installed (dishwasher with racks, pre rinse etc..), however one of the products is above the maximum limit.