Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Monitoring Period

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Mari Hamasaki  on 

What is the required monitoring period for this credit?

0

Master's Research Survey

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.

0

M&V Option 3 for Building Additions

NC-2009 EAc5:Measurement and Verification
posted by  Mark Zoeteman  on 

If a LEED project boundary only includes a building addition, would the Addition natural gas, electricity and water utilities need to be separately submetered if fed from main building utility serv

1
Mon Apr 20, 2015, 6:28 pm

Church+Classrooms = Office?

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Charles Shinneman  on 

I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.

1
Sat Aug 26, 2017, 3:42 pm

How FINAL is the Appeal?

General forums
posted by  Mary Kay  on 

EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?

0

Ergonomist Design Phase Involvement

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Marissa Hebert  on 

This may be an obvious answer, but it seems a little vague to me.

0

ASHRAE Advanced Energy Design Guide - Option 2

NC-v4 EAc2:Optimize energy performance
posted by  Aaron Wascher  on 

Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.

1
Mon Oct 5, 2015, 10:00 pm

Eligible for Exemplary Performance Credit?

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Owen Hyne  on 

We anticipate meeting/exceeding requirements for SSc6.1 "Quantity Control", but not SSc6.2 "Quality Control".

1
Sat Aug 26, 2017, 4:27 pm

DDA Boundary

NC-v4 LTc3:High priority site
posted by  Trevor Anderson  on 

Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?

1
Thu Apr 21, 2016, 3:27 pm

Envelope Categorization

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Russell Philstrom  on 

Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.

0