Forum quick links
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
Master's Research Survey
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
M&V Option 3 for Building Additions
NC-2009 EAc5:Measurement and Verificationposted by Mark Zoeteman on
If a LEED project boundary only includes a building addition, would the Addition natural gas, electricity and water utilities need to be separately submetered if fed from main building utility serv
Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.
How FINAL is the Appeal?
posted by Mary Kay on
EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?
Ergonomist Design Phase Involvement
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Marissa Hebert on
This may be an obvious answer, but it seems a little vague to me.
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Eligible for Exemplary Performance Credit?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Owen Hyne on
We anticipate meeting/exceeding requirements for SSc6.1 "Quantity Control", but not SSc6.2 "Quality Control".
DDA Boundary
NC-v4 LTc3:High priority siteposted by Trevor Anderson on
Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?
Envelope Categorization
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Russell Philstrom on
Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.