Forum quick links
colorants (for polished concrete floor) containing formaldehyde?
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Debra A. Lombard on
we are a GC on a LEED NC v2009 project. we'll be doing both IAQ testing as well as a limited flush out, not nearly the Air exchanges for just doing flush out.
Multiple Points for One RPC
NC-2009 RPc1:Regional priorityposted by Suzanne Johnson on
Water efficient landscaping is listed as an RPC in the database for a project. It states "WEc1 I Up to 4 Points".
Rooftop Greenhouse
Schools-2009 SSc5.2:Site development - maximize open spaceposted by Sarah Nugent on
Hi everyone, I have an urban project which is installing a greenhouse for educational purposes.
Monitoring VRF unit
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Edmée Knight on
We are installing an air cooled VRF system with a DOAS in our building.
EAp2 Domestic Hot Water Pump sizing
NC-2009 EAp2:Minimum energy performanceposted by MKK LEED on
Hello, Appendix G Table G.3.1 - Service Hot water systems states "The service hot-water system in the baseline building design shall use the same energy source as the corresponding system in
Requirement to survey students in higher ed bldgs?
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Renee Shirey on
In earlier versions of LEED 2009, the credit language specifically clarified that occupants included students grade 6 and above.
Certification agency meeting the ISO Guidelines
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Stephanie Graham on
Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC Guide
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
PIf2
NC-2009 PIf2:Project Summary Detailsposted by shaun Andriano on
This might be an easy one... Our PI form 2 was recently not approved following final design review.
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!