Sedum as native plants

CS-2009 WEc1:Water Efficient Landscaping
posted by  Dave L  on 

Hi, I have been advised that the sedum plants would meet this credit on green roofs due to the fact that the plants would be indigenous for landscaping in general.

0

WEc2: Time frame for functional reclaimed water systems

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Brian Bartholomew  on 

Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys

1
Sat Aug 26, 2017, 9:52 pm

Bird Collision Deterrence Monitoring Plan

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Ivan Romero  on 

Our intention is to pursue Bird Collision Deterrence under NC. Several questions: 1.

0

R-Value for wall assembly

NC-2009 EAp2:Minimum Energy Performance
posted by  Sunil S  on 

I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti

1
Thu Aug 17, 2017, 3:45 pm

Dining facility overall area with or without walk-in coolers

NC-2009 EAp2:Minimum Energy Performance
posted by  Addisu Lemlem  on 

Thanks Marcus, I just saw your response below. Follow up question, does a kitchen with higher sensible & latent load qualify for exception b. Thanks,

1
Mon Jul 11, 2016, 3:02 pm

Total Water Use Calculator

Homes-v4 WEc1:Total water use
posted by  Phil Vetterkind  on 

Is there a off line calculator for "Total Water Use" yet?

1
Tue May 9, 2017, 5:28 pm

Natatorium Locker Rooms

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Carl Karlen  on 

I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.

0

Project diversion rate v. facility rate

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Deborah Ebersole  on 

If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin

1
Thu Jan 12, 2017, 6:47 pm

Urban setting/city block difficulties

Pilot-Credits PC14:Walkable Streets
posted by  Nicholas Bristow  on 

When completing this pilot credit, it seems that it should give more allowances for buildings that have streets on all four sides (take up an entire city block).

1
Wed Apr 6, 2016, 4:26 pm

Separation between patient and staff places of respite

Healthcare-v2009 SSc9.1:Connection to the natural world - places of respite
posted by  Emily Hope  on 

I am seeking clarification on where places of respite for staff and for patients should be located.

1
Fri Feb 26, 2016, 6:33 pm