Forum quick links
IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.
CS v2009 Appendix 4 - Lease and Sales agreement
posted by Becky Stumm on
I have a project that the owner/landlord are seeking LEED-CS certification, but none of the tenants have any interest in seeking LEED-CI certification.
District graywater recycling system
NC-2009 WEc3:Water Use Reductionposted by Brian Meinrath on
I am working on a large project that includes over 10 buildings.
Automatic Receptacle Control for Renovation projects
CI-v4 EAp2:Minimum energy performanceposted by Jeni Panars on
ASHRAE requires at least half of all private offices, open offices, and computer classrooms to be controlled by an automatic control device.
Narrative explaining compliance of ESC plan with NPDES guideline
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Madhura Dhayagude on
Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.
Energy Recovery Bypass
NC-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Certification Process for a Green Cleaning Product
EBOM-v4 EQp3:Green cleaning policyposted by Franklin Raines on
What is the certification or approval process for Green Cleaning Products compliant as part of a LEED-EBOM program?
UCSB - Bren Hall
Pilot-Credits IPpc96:LEED Labposted by Brandon Kaysen on
We are very excited to be wrapping up our third LEED Lab project at UCSB. This ear we are certifying the iconic Bren Hall under Version 4 of the EBO&M rating system.
Historic Bldg Renovation being done in phases, Bldg reuse calcs
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
Water Usage for parks and open spaces
CS-2009 WEp1:Water Use Reductionposted by Deborah Lucking on
Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users.