Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Outdoor shower?

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Cindy Quinn  on 

Any chance an outdoor shower with curtained off changing area would qualify in a hot, arid climate?

1
Thu Mar 2, 2017, 6:36 pm

Athletic Track

NC-2009 SSc2:Development density and community connectivity
posted by  Erica Downs  on 

Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!

1
Tue May 16, 2017, 9:40 pm

set top boxes and other lab test equipment

CI-2009 EAp2:Minimum energy performance
posted by  Gail Napell  on 

We have a client who runs tests on Set Top Boxes in a test lab for their customers to determine problems and fix them.

1
Mon Nov 10, 2014, 2:43 pm

LEED user Assembly Calculator for Certified Wood

NC-2009 MRc7:Certified wood
posted by  Esther Kohout  on 

Still confused on FSC certified wood. If we as FSC Certified woodworkers, create an assembly with FSC materials, and non FSC materials, that assembly cannot be claimed as an FSC certified.

0

EA Credit 1 ACP (Alternative Compliance Path)

CS-2009 EAc1:Optimize energy performance
posted by  Harry Flamm  on 

Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?

1
Sat Feb 14, 2015, 1:20 am

Master's Research Survey

NC-2009 WEp1:Water use reduction
posted by  Vibha Pai  on 

I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.

0

77 Olfactory Comfort

WELL v1 Building Standard Tip Sheet
posted by  Carina Clark  on 

If a commercial project is looking to provide a kitchen/break room, some options include a separation by negative pressurization and hallways.

1
Tue Mar 14, 2017, 7:53 pm

Enhanced Refrigerant Management - Purchased Cooling Loop

NC-2009 EAc4:Enhanced refrigerant management
posted by  Vinny Greco  on 

If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?

1
Thu Feb 11, 2016, 7:32 am

Above ground-floor horizontal exterior spaces (plaza, roof)

NC-v4 SSc6:Light pollution reduction
posted by  Jill Perry, PE  on 

Forgive me if this was covered elsewhere but I couldn't find it.

1
Thu Jun 8, 2017, 2:40 pm

Final Cleaning

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Benjamin McGrath  on 

For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.

1
Sat Aug 26, 2017, 8:50 pm