Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.
measuring heat pump load for system submetering
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by ethan adams on
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.
Canopy to building with wall opening (is it a "complete bldg")?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Lee on
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.
Upload Documentation
EBOM-2009 SSc4:Alternative commuting transportationposted by Patrick Stark on
I am doing option 3, approach 1.
Tenant Installed Equipment and Appliances
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by James Keohane on
I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.
Masonry Flash Mastic
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Chris Moore on
Our masonry contractor submitted VOC documentation on Wire-Bond Aqua Flash Mastic with a VOC content of 270 g/L. I am first not sure if this needs to be submitted for IEQc4.1 or not.
NC V4: Thermal Comfort
NC-v4 EQc5:Thermal comfortposted by Erik Gutierrez on
Hello, I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. To be specific, the new construction is a restaurant.
ACP / developer control percentage penalizes existing buildings?
CS-2009 EAp2:Minimum energy performanceposted by Jareb Ketay on
I've done a number of Core and Shell models before, and always use the ACP calculator.
Existing Building Demolition
posted by Andrew McLaughlin on
We are working on a proposed new Police Headquarters on the same site as the existing Police Building.
Using LEED version 2.2 approval as a precedent
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Judhajit Chakraborty on
Hello, I am working on a campus project where there is common parking for the project I am working on and another project which is LEED platinum certified under the 2.2 version.