Forum quick links
Outdoor shower?
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Cindy Quinn on
Any chance an outdoor shower with curtained off changing area would qualify in a hot, arid climate?
Athletic Track
NC-2009 SSc2:Development density and community connectivityposted by Erica Downs on
Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!
set top boxes and other lab test equipment
CI-2009 EAp2:Minimum energy performanceposted by Gail Napell on
We have a client who runs tests on Set Top Boxes in a test lab for their customers to determine problems and fix them.
LEED user Assembly Calculator for Certified Wood
NC-2009 MRc7:Certified woodposted by Esther Kohout on
Still confused on FSC certified wood. If we as FSC Certified woodworkers, create an assembly with FSC materials, and non FSC materials, that assembly cannot be claimed as an FSC certified.
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize energy performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?
Master's Research Survey
NC-2009 WEp1:Water use reductionposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
77 Olfactory Comfort
posted by Carina Clark on
If a commercial project is looking to provide a kitchen/break room, some options include a separation by negative pressurization and hallways.
Enhanced Refrigerant Management - Purchased Cooling Loop
NC-2009 EAc4:Enhanced refrigerant managementposted by Vinny Greco on
If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?
Above ground-floor horizontal exterior spaces (plaza, roof)
NC-v4 SSc6:Light pollution reductionposted by Jill Perry, PE on
Forgive me if this was covered elsewhere but I couldn't find it.
Final Cleaning
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Benjamin McGrath on
For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.