Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Can we use the IEQc4.5 Furniture and Furnishings as an ID credit

NC-2009 IDc1:Innovation in Design
posted by  Carmen Vidal-Hallett  on 

Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.

0

Campus Site Lignting Calcs - again, sorry

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?

1
Mon Oct 6, 2014, 5:27 pm

Zero Lot Line calc

NC-v4 SSc4:Rainwater management
posted by  Janika McFeely  on 

Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?

1
Tue Apr 21, 2015, 6:03 pm

open grid paving and gravel

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erin Holdenried  on 

What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks

1
Mon Aug 1, 2016, 8:06 pm

Land disturbed vs. land supporting normal building operation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michelle Bombeck  on 

This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.

1
Thu Jul 9, 2015, 7:45 pm

High Pressure Sodium lamps--interior or exterior?

Healthcare-v2009 MRp2:PBT source reduction - mercury
posted by  Maria Unruh  on 

The table MRp2-2, is this for HPS lamps for the entire project or for the interior only?

1
Sun Aug 27, 2017, 12:23 am

Blowout toilets in v4

NC-v4 WEp2:Indoor water use reduction
posted by  Ben Roush  on 

In v2009, you could use 3.6 GPF blowout toilets in institutional uses, but could not show savings for using blowout toilets with lower flow.

1
Tue Apr 18, 2017, 2:12 pm

Canopy to building with wall opening (is it a "complete bldg")?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Lee  on 

We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.

1
Fri Nov 27, 2015, 3:52 am
1
Wed Feb 1, 2017, 11:51 pm

Tenant Installed Equipment and Appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  James Keohane  on 

I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.

1
Wed Dec 23, 2015, 5:35 pm