Can we use the IEQc4.5 Furniture and Furnishings as an ID credit
NC-2009 IDc1:Innovation in Designposted by Carmen Vidal-Hallett on
Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.
Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
open grid paving and gravel
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.
High Pressure Sodium lamps--interior or exterior?
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Maria Unruh on
The table MRp2-2, is this for HPS lamps for the entire project or for the interior only?
Blowout toilets in v4
NC-v4 WEp2:Indoor water use reductionposted by Ben Roush on
In v2009, you could use 3.6 GPF blowout toilets in institutional uses, but could not show savings for using blowout toilets with lower flow.
Canopy to building with wall opening (is it a "complete bldg")?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Lee on
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.
Upload Documentation
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Patrick Stark on
I am doing option 3, approach 1.
Tenant Installed Equipment and Appliances
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Keohane on
I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.