Base building HVAC Efficiency and Baseline & Proposed WWR

CI-v4 EAp2:Minimum energy performance
posted by  ESD Engineer  on 

Hi, The projects space is served by the base building AHU and Chiller plants. Efficiency of which don't meet the min prescribed efficiency as per ASHRAE 90.1-2010.

1
Wed Aug 23, 2017, 1:58 pm

v4 vs v2009, Bicycle Shower Facilities Location

NC-v4 LTc6:Bicycle facilities
posted by  Miles Thorne  on 

Sorry for the redundancy - v3 tips offered up the following: "Remember that bicycle storage and shower facilities must be exclusive to occupants for the project, or a sufficient quantity must be p

1
Wed Jul 22, 2015, 2:10 am

Campus

Pilot-Credits PC14:Walkable Streets
posted by  Megan Recher  on 

We are applying the pilot credit in a campus setting, where the primary façade fronts a pedestrian plaza, as opposed to street.

1
Mon Nov 14, 2016, 7:13 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 EAp2:Minimum energy performance
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Fri May 22, 2015, 1:33 pm

want to get information about previous LEED certified projects

NC-2009 PIf2:Project Summary Details
posted by  Amir Salehi  on 

Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,

1
Fri Oct 21, 2016, 10:50 pm

Reduced parking footprint for College/University

NC-v4 LTc7:Reduced parking footprint
posted by  Iris Amdur  on 

The project is a single building which is part of a larger educational campus.

1
Tue Aug 29, 2017, 10:04 pm

Updating documentation with consistent or more recent dates?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sara Goenner Curlee  on 

For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.

1
Tue May 31, 2016, 12:10 pm

Group Approach for EAp2 & EAc1 certification

NC-2009 EAp2:Minimum energy performance
posted by  soham babu  on 

The question is related to Group Approach when we input two building details in minimum energy performance calculator, out of two building one of the building will not achieve the energy cost savin

1
Thu Aug 31, 2017, 3:23 pm

Cleaning Requirements for bathroom demo

CI-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Megan Bove  on 

If there is a CI project that has an existing bathroom that is set to be demolished as other build outs are happening, are there specific VOC requirements for the products that they can use?

1
Tue Mar 17, 2015, 1:28 pm

Required Documentation: All Projects for Site Management credit

EBOM-v4 SSc5:Site management
posted by  JOHN COOK  on 

Hello, Is there an example of an acceptable "air quality protection log" that USGBC is looking for in this credit?

0