Forum quick links
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
want to get information about previous LEED certified projects
NC-2009 PIf2:Project Summary Detailsposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
Reduced parking footprint for College/University
NC-v4 LTc7:Reduced parking footprintposted by Iris Amdur on
The project is a single building which is part of a larger educational campus.
Updating documentation with consistent or more recent dates?
posted by Sara Goenner Curlee on
For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.
Group Approach for EAp2 & EAc1 certification
NC-2009 EAp2:Minimum Energy Performanceposted by soham babu on
The question is related to Group Approach when we input two building details in minimum energy performance calculator, out of two building one of the building will not achieve the energy cost savin
Cleaning Requirements for bathroom demo
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Megan Bove on
If there is a CI project that has an existing bathroom that is set to be demolished as other build outs are happening, are there specific VOC requirements for the products that they can use?
Required Documentation: All Projects for Site Management credit
EBOM-v4 SSc5:Site managementposted by JOHN COOK on
Hello, Is there an example of an acceptable "air quality protection log" that USGBC is looking for in this credit?
1 year contract?
NC-2009 EAc6:Green powerposted by Erin Holdenried on
In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.
Systems Observed In Person
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Devki Wright on
Our CxA wasn't able to observe lighting controls in person when he came to commission the other building systems.
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?