Fan Power Approach Not Commented on by LEED Reviewer
NC-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I just got some comments back from a LEED submission. The reviewer notes that my input summary does not match the plans.
Policy Template - Maintenance Equipment "goals"
EBOM-v4 SSp1:Site management policyposted by Maureen Colburn on
In the Site Mgt Policy template for this prerequisite under the "goals" section for maintenance equipment, 3 options to select from are listed (limit grass, use only manual or electric equipment,
LEED Green Associate Exam!!! Leedv4
posted by Julian Laze on
Hi Paula. Thanks for your information and your tips... I have the book, but at the end of each chapter I'm seeing questions that I never crossed reading the chapter.
Building Envelope Trade Off
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I have 2 questions about EAp2. 1.
Diverse "publicly available" use
NC-v4 LTc4:Surrounding density and diverse usesposted by Gina Rossi on
Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".
CHP Plant Electricity Generation Credit and Efficiency Calcs
NC-2009 EAc1:Optimize Energy Performanceposted by MKK LEED on
We are working on a higher ed. project building connected to a campus-wide district heating/cooling and power plant.
Regularly Occupied Spaces Consistency Across All Credits
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Summer Minchew on
We provided a sample floor plan of future tenant area to document this credit.
ID credit in a hospital?
Schools-2009 IEQc10:Mold Preventionposted by Payette Library on
We're thinking about going for this credit for a Hospital project (NC v2.2), since code requires all hospitals to have strict mold prevention measures.
The envelope data for old building (baseline) are not avaiable
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Hi, I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec.
Innovation In Design Credits
NC-2009 IDc1:Innovation in Designposted by Brian Harris on
After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal? Myles Huddart LEED AP BD+C