Forum quick links
District graywater recycling system
NC-2009 WEc3:Water use reductionposted by Brian Meinrath on
I am working on a large project that includes over 10 buildings.
Automatic Receptacle Control for Renovation projects
CI-v4 EAp2:Minimum energy performanceposted by Jeni Panars on
ASHRAE requires at least half of all private offices, open offices, and computer classrooms to be controlled by an automatic control device.
Narrative explaining compliance of ESC plan with NPDES guideline
NC-2009 SSp1:Construction activity pollution preventionposted by Madhura Dhayagude on
Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.
Energy Recovery Bypass
NC-2009 EAp2:Minimum energy performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Certification Process for a Green Cleaning Product
EBOM-v4 EQp3:Green cleaning policyposted by Franklin Raines on
What is the certification or approval process for Green Cleaning Products compliant as part of a LEED-EBOM program?
UCSB - Bren Hall
Pilot-Credits IPpc96:LEED Labposted by Brandon Kaysen on
We are very excited to be wrapping up our third LEED Lab project at UCSB. This ear we are certifying the iconic Bren Hall under Version 4 of the EBO&M rating system.
Historic Bldg Renovation being done in phases, Bldg reuse calcs
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
Water Usage for parks and open spaces
CS-2009 WEp1:Water use reductionposted by Deborah Lucking on
Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users.
Denial of EA PR2
NC-2009 EAp2:Minimum energy performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Airflow measurement device serving multiple AHUs?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Mike Fortier on
Hello, Is it okay to install one airflow measurment device within an outdoor air intake that serves multiple AHUs or does each AHU need to have its own airflow measurement device? Thanks!