Forum quick links
LEED v.2009 NC EA Credit 5
NC-2009 EAc5:Measurement and Verificationposted by Andrew Buck on
We are designing a Hotel with the following systems:
LEED CI project boundary
CI-2009 PIf1:Minimum Program Requirementsposted by Drashti Dhirwani on
I am working on a 125,000 SF CI project, where approximately 2,500 SF space (2 private offices and a kitchen) was designed by a different designer, has a different contractor and is being cons
Minimum Energy Performance and moduline units
CI-v4 EAp2:Minimum energy performanceposted by Scott Harbaugh on
The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units. Is it possible to get EQ prerequisite Minimmum Energy Performanc
Airside HVAC
Schools-EBOM-v4 EAp2:Minimum energy performanceposted by John on
Main Building Utility Meter Data Acquisition
CS-v4 EAp3:Building-level energy meteringposted by Michael Costello on
Do Main Building Utility Meters have to automatically transmit monthly data to to the BMS system managing the the whole building energy data?
What is the definition of annual increase? Volume difference in 1-year 24-hour rainfall event?
NC-v4 SSc4:Rainwater managementposted by John Zhang on
Based on my understanding by reading the posts on this web site, it seems to me that for option #1, all volume from the 95th or 98th percentile of rainfall to be captured
Low Emitting Materials
CI-v4 EQc2:Low emitting materialsposted by Laurie Johnson on
Is it possible to choose voc budget Option 2 for one catagory and Emisssions Criterial Option 1 for other categories or is it all one option or the other?
Parking Garage?
ND-v2009 GIBc15:Recycled content in infrastructureposted by Stacey Olson on
Would a subterranean parking garage need to be included as infrastructure? Or are we looking at infrastructure from an airplane-view?
Replacing High-mercury lamps in Performance Period before useful life
EBOM-v4 MRc2:Purchasing - lampsposted by on
If the overall average of 70 picograms per lumen hour is not satisfied, and the lamps identified to have high mercury content do not complete their useful life before the performance period en
One Address but buildings are not physically Attached
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Jay Murray on
The owner of an office property wants to go for LEED EBOM. There are 3 buildings, two are attached with an architectural overhang and the third is roughly 40 feet away.