Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

LEED v.2009 NC EA Credit 5

NC-2009 EAc5:Measurement and Verification
posted by  Andrew Buck  on 

We are designing a Hotel with the following systems:

1
Thu Nov 30, 2017, 5:35 pm

LEED CI project boundary

CI-2009 PIf1:Minimum Program Requirements
posted by  Drashti Dhirwani  on 

I am working on a 125,000 SF CI project, where approximately 2,500 SF space (2 private offices and a kitchen) was designed by a different designer, has a different contractor and is being cons

0

Minimum Energy Performance and moduline units

CI-v4 EAp2:Minimum energy performance
posted by  Scott Harbaugh  on 

The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units.  Is it possible to get EQ prerequisite Minimmum Energy Performanc

1
Tue Nov 28, 2017, 4:55 pm

Airside HVAC

Schools-EBOM-v4 EAp2:Minimum energy performance
posted by  John   on 
What capacity and CFM value should be entered in the minimum energy performance calculator (air side HVAC tab) for HVAC systems when the capacity value is made to "eQuest default" in order to reduce t
0

Main Building Utility Meter Data Acquisition

CS-v4 EAp3:Building-level energy metering
posted by  Michael Costello  on 

Do Main Building Utility Meters have to automatically transmit monthly data to to the BMS system managing the the whole building energy data?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Wed Nov 22, 2017, 6:51 am

What is the definition of annual increase? Volume difference in 1-year 24-hour rainfall event?

NC-v4 SSc4:Rainwater management
posted by  John Zhang  on 

Based on my understanding by reading the posts on this web site, it seems to me that for option #1, all volume from the 95th or 98th percentile of rainfall to be captured

3
Tue Nov 21, 2017, 8:43 pm

Low Emitting Materials

CI-v4 EQc2:Low emitting materials
posted by  Laurie Johnson  on 

Is it possible to choose voc budget Option 2 for one catagory and Emisssions Criterial Option 1 for other categories or is it all one option or the other?

1
Fri Mar 23, 2018, 3:14 pm

Parking Garage?

ND-v2009 GIBc15:Recycled content in infrastructure
posted by  Stacey Olson  on 

Would a subterranean parking garage need to be included as infrastructure? Or are we looking at infrastructure from an airplane-view?

3
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Tue Nov 14, 2017, 12:00 am

Replacing High-mercury lamps in Performance Period before useful life

EBOM-v4 MRc2:Purchasing - lamps
posted by     on 

If the overall average of 70 picograms per lumen hour is not satisfied, and the lamps identified to have high mercury content do not complete their useful life before the performance period en

1
Mon Feb 26, 2018, 7:09 pm

One Address but buildings are not physically Attached

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Jay Murray  on 

The owner of an office property wants to go for LEED EBOM. There are 3 buildings, two are attached with an architectural overhang and the third is roughly 40 feet away.

1
Fri Nov 17, 2017, 12:09 am