Parking Garage?

ND-v2009 GIBc15:Recycled content in infrastructure
posted by  Stacey Olson  on 

Would a subterranean parking garage need to be included as infrastructure? Or are we looking at infrastructure from an airplane-view?

3
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Tue Nov 14, 2017, 12:00 am

Replacing High-mercury lamps in Performance Period before useful life

EBOM-v4 MRc2:Purchasing - lamps
posted by     on 

If the overall average of 70 picograms per lumen hour is not satisfied, and the lamps identified to have high mercury content do not complete their useful life before the performance period en

1
Mon Feb 26, 2018, 7:09 pm

One Address but buildings are not physically Attached

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Jay Murray  on 

The owner of an office property wants to go for LEED EBOM. There are 3 buildings, two are attached with an architectural overhang and the third is roughly 40 feet away.

1
Fri Nov 17, 2017, 12:09 am

Do windows behind employees count towards qualifying views?

NC-v4 EQc8:Quality views
posted by  Helene Lefkowitz  on 

Hello - My project has several windows that will be behind employees as they work as desks.

1
Mon Nov 13, 2017, 12:33 pm

Compliant views for glazing at 8-10 feet above finished floor

NC-v4 EQc8:Quality views
posted by  Helene Lefkowitz  on 

Hello - I am working on a warehouse project that only has windows between 8-10 feet above finished floor. Occupants will mostly be standing as they work.

1
Mon Nov 13, 2017, 12:35 pm

Demand Control Ventilation (DCV) Compliance Documentation?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Robert Pickering  on 

We are working on certifying a building that has demand-controlled ventilation (DCV), controlled by CO2 sensors.

1
Thu Dec 21, 2017, 12:06 am

Calculating per Person

NC-v4 LTc7:Reduced parking footprint
posted by  Amber Duco  on 

We have a unique project type (zoo) and are using the "other public assembly" use where you calculate parking spaces by "0.25/person in permitted capacity where not seated".  My question

1
Mon Jan 22, 2018, 5:51 pm

Equipment efficiencies / DX Cooling Coil EER and COP

NC-2009 EAp2:Minimum Energy Performance
posted by  F S  on 

Hi all.

Question about ASHRAE 90.1 Baseline equipment efficiencies.Project is using System 5 with a Load of around 400kBtu/h.  Table 6.8.1A shows the minimum efficiency to be 9.8

2
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Nov 6, 2017, 6:59 am

Refrigerants

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Peter Doo  on 

Can proper recycling and/or disposal of refrigerants be considered a waste stream for the purpose of LEED compliance?

1
Tue Oct 31, 2017, 8:08 pm

Porous materials fully enclosed building?

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Summer Minchew  on 

I have seen IAQ specifications that state "Do not load or install drywall, other porous materials and components, and items with high organic content into partially enclosed building." Is this a re

1
Wed Nov 1, 2017, 3:07 pm