Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Building Add-on to Design-Build Parking Structure

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  GBD Architects  on 

We are pursuing an office project that would be essentially an addition to a parking structure that is being built design-build just several months in advance of when our work would take place.

1
Thu Jan 4, 2018, 5:13 pm

Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  bryan lauer  on 

For Miami-Dade County, FL.

In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)?  In the building 

1
Mon Jan 15, 2018, 11:05 pm

O+M Starter Kit for CI

CI-v4 INc1:Innovation
posted by  Kristen Magnuson  on 

Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.

1
Thu Dec 14, 2017, 10:59 pm

Service Sink Baseline flow

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jorge Torres-Coto  on 

I have a project that includes mainly Vocational Classrooms.  As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta

0

Small addition to existing building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edmée Knight  on 

Our project is a small addition (<10% of total building GSF) to an existing building.

1
Tue Dec 12, 2017, 10:19 pm

Fundamental Commissioning Timeline

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Todd Bundren  on 

I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.

1
Fri Dec 15, 2017, 5:26 pm

Bi-polar ionization

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Suchi Daniels  on 

Universities and Colleges in Florida have installed bi-polar ionization for multiple purposes.  First, improved energy efficiency, second improved indoor air quality, and third, reduced mainte

1
Wed Dec 13, 2017, 3:56 pm

CS 2009 & CI v4

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Susan Di Giulio  on 

Like Melissa Merryweather, I am writing SSc9 Tenant Guidelines for a LEED v2009 C&S project, and now we are well past the line where any tnenat would have to pursue LEED-CI v4.

6
Default Avatar
Green Building Specialist
U.S. Green Building Council
LEEDuser Premium Member
2 thumbs up
Sat Dec 2, 2017, 6:28 am

EBOM Integrated Pest management - indoor and outdoor

Schools-2009 IDc1:Innovation in Design
posted by  Drashti Dhirwani  on 

For a school project, is it possible to achieve two points in ID for Integrated Pest Management from EBOM credit library?

1
Wed Dec 13, 2017, 5:31 pm