Building Add-on to Design-Build Parking Structure
NC-v4 MPR2:Must use reasonable LEED boundariesposted by GBD Architects on
We are pursuing an office project that would be essentially an addition to a parking structure that is being built design-build just several months in advance of when our work would take place.
Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by bryan lauer on
For Miami-Dade County, FL.
In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)? In the building
O+M Starter Kit for CI
CI-v4 INc1:Innovationposted by Kristen Magnuson on
Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.
Service Sink Baseline flow
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jorge Torres-Coto on
I have a project that includes mainly Vocational Classrooms. As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta
Treatment of Garages in calculating CWM Baselines
Homes-v4 MRc3:Construction waste managementposted by Kimberly Vermeer on
Small addition to existing building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Edmée Knight on
Our project is a small addition (<10% of total building GSF) to an existing building.
Fundamental Commissioning Timeline
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Todd Bundren on
I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.
Bi-polar ionization
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Suchi Daniels on
Universities and Colleges in Florida have installed bi-polar ionization for multiple purposes. First, improved energy efficiency, second improved indoor air quality, and third, reduced mainte
CS 2009 & CI v4
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Susan Di Giulio on
Like Melissa Merryweather, I am writing SSc9 Tenant Guidelines for a LEED v2009 C&S project, and now we are well past the line where any tnenat would have to pursue LEED-CI v4.
EBOM Integrated Pest management - indoor and outdoor
Schools-2009 IDc1:Innovation in Designposted by Drashti Dhirwani on
For a school project, is it possible to achieve two points in ID for Integrated Pest Management from EBOM credit library?