Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Garden and Recreation space

NC-v4 SSc3:Open space
posted by  Jonelle Humphrey  on 

If I were designing a two-way running path, with each direction of travel to be separated by a (narrow) raised garden bed along the edge of my site, would this area count towards "garden space

1
Wed Feb 21, 2018, 12:59 am

Sidewalk Considered "Bike Network"?

NC-v4 LTc6:Bicycle facilities
posted by  Jenni Betancourt  on 

Hey LEEDusers - If a sidewalk is min. 5' wide, will GBCI consider that a one-way bicycle network? The project is in a suburb of Chicago. Thanks in advance for comments!

1
Fri Feb 16, 2018, 10:25 pm

Compliance through furnished measurement

NC-v4 EQc9:Acoustic performance
posted by  Martin Stowell  on 

Is it possible to achieve compliance for this credit by taking reverberation measurements once the multifamily units are occupied and furnished?

2
Default Avatar
Energy Engineer
EBI Consulting
LEEDuser Basic Member
2 thumbs up
Thu Feb 15, 2018, 10:43 pm

RE split between on site production and lease agreement

NC-v4 EAc5:Renewable energy production
posted by  Jason Garvens  on 

Can a project split the source of renewable energy used on site between their own on site system and making up the rest through a purchase agreement with a community RES?

Example:

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Mon Feb 12, 2018, 9:47 pm

Utility Service Area

NC-v4 EAc5:Renewable energy production
posted by  Johanna Scogin  on 

I'm confused as to the wording for solar gardens or community renewable energy systems (off-site): "The system is located with the same utility service area as the facility claiming the use." Does

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Mon Feb 12, 2018, 9:19 pm

Successful Option 4 with Zipcar?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Geoffrey Brock  on 

Has anybody heard of a successful option 4 using zipcar?...I'm concerned about the "use restriction" requirement mentioned in previous comments. Has this ever been achieved?...

4
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Fri Feb 9, 2018, 10:21 am

MRc2 Construction Waste Management

CI-2009 MRc2:Construction Waste Management
posted by  Michael Roth  on 

I have comingled waste and diverted metals.  One recycler sorts CMU, wood, paper/cardboard and metal off-site and records are kept in CYDs.  The other two recycle centers do Ferrous metal

4
Thu Feb 8, 2018, 9:55 pm

Not sure what we can do with this credit

EBOM-v4 SSc6:Site improvement plan
posted by  Meier Corporate Account  on 

Our facility was constructed in the center of 96 acres of asphalt. The area had been asphalt for well over 20 years before this.

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Wed Feb 7, 2018, 4:21 pm

The correct/latest 62MZ & LEED min. IAQ spreadsheet?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Aru Sau  on 

Is "v2009v4_Minimum IAQ Performance Calculator_v03" spreadsheet is the correct/right one for a project registered in February 2016 in LEED 2009? Also, Is there any updated "62MZCalc.xls" (Revised A

11
Mon Feb 5, 2018, 7:18 pm

Controllability in Gallery/Exhibition spaces

NC-v4 EQc6:Interior lighting
posted by  Elizabeth Powers  on 

Does anyone have experience or insight into achieving this credit in gallery or exhibition spaces?

3
Mon Feb 5, 2018, 5:06 am