Forum quick links
Inspection reports vs photos?
NC-v4 EQc3:Construction indoor air quality management planposted by Erin Holdenried on
In v2009, inspection reports were sufficient documentation to confirm the implementation of the IAQ Mgmt Plan. Is this still acceptable? The LEED v4 reference guide only mentions photog
On - Site Solar Panels with in house Manually recorded sub metering
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Robert Fernandez on
Hello,
Gender Neutral toilets
NC-v4 WEp2:Indoor water use reductionposted by Jude Chakraborty on
Hello, we are working on an University project which has a directive on Gender Neutral toilets which means there are no urinals in the building.
Meal program and workers
posted by Emily Neal on
Not sure how to best explain this so Im hoping if I give you the data, someone can help guide me in how im supposed to calculate this...
Efficient Refrigeration Equipment
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
Under 'Further explanation - Exceptional Calculation method - Changes from earlier versions of ASHRAE and LEED', the CI reference guide states "All project types may count energy savings from effic
How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
How to fill out the Credit form for IEQc5 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
General Emissions Evaluation for installation products
Schools-EBOM-v4 EQc1:Indoor air quality management programposted by Sara Axon on
For installation of millwork, our installer uses basic items: liquid nail, wood glue, silicone, spackle, etc.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Christina Nontanovan on
Hello,