Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Case 2 Option 2C

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Patrick Cellie  on 

I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system. 

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Tue Jan 22, 2019, 9:14 pm

Construction and Demolition Waste Management Plan – Sample

CI-v4 MRc6:Construction and demolition waste management
posted by  milo valenti  on 

Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?

3
Default Avatar
Green Building Consultant
LEEDuser Basic Member
20 thumbs up
Tue Jan 22, 2019, 7:51 pm

Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Todd Bundren  on 

Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?

0

Intermittent ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Dustin Smith  on 

Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?

0

waste generated from new construction

Mid-Rise-v4 MRc3:Construction waste management
posted by  sue bryant  on 

If you are removing an existing building, can the waste from the building be counted if you are recycling it?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 22, 2019, 8:21 am

On-site or off-site separation

Homes-v4 MRc3:Construction waste management
posted by  Amrit Kaur  on 

The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.

2
Senior Director
Linnean Solutions
LEEDuser Expert
2 thumbs up
Tue Jan 22, 2019, 6:27 am

Option 2 - Excluding Demo

NC-v4 MRc5:Construction and demolition waste management
posted by  Nathan Gauthier  on 

The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie

17
Default Avatar
Mission Green Buildings
LEEDuser Basic Member
0 thumbs up
Mon Jan 21, 2019, 10:25 pm

How does EPA Method 24 compare to CDPH Standard Method v1.1-2010?

NC-v4 EQc2:Low emitting materials
posted by  Summer Gorder  on 

We finally found a Static Control Epoxy Coating for a concrete floor that meets the VOC requirement, although it only References EPA Method 24.

1
Fri Jan 18, 2019, 9:21 pm

Budget Calculation Method - can Option 1 be used for the other categories where all products are compliant

NC-v4 EQc2:Low emitting materials
posted by  Summer Gorder  on 

I have never had to utilize the Budget Calculation Method for compliance using my GBIM verification system, but have one category that may not comply for a large public project pursuing LEED Platin

0
2
Certification Team Lead
Green Business Certification Inc. (GBCI)
LEEDuser Premium Member
11 thumbs up
Thu Jan 17, 2019, 5:18 pm