Forum quick links
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
Construction and Demolition Waste Management Plan – Sample
CI-v4 MRc6:Construction and demolition waste managementposted by milo valenti on
Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?
Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Todd Bundren on
Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?
Intermittent ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dustin Smith on
Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?
waste generated from new construction
Mid-Rise-v4 MRc3:Construction waste managementposted by sue bryant on
If you are removing an existing building, can the waste from the building be counted if you are recycling it?
On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie
How does EPA Method 24 compare to CDPH Standard Method v1.1-2010?
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
We finally found a Static Control Epoxy Coating for a concrete floor that meets the VOC requirement, although it only References EPA Method 24.
Budget Calculation Method - can Option 1 be used for the other categories where all products are compliant
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
I have never had to utilize the Budget Calculation Method for compliance using my GBIM verification system, but have one category that may not comply for a large public project pursuing LEED Platin
LEED V4 Homes Total Reduction Calcukator
Homes-v4 WEc1:Total water useposted by Michael Glincman on
Hello All,