Forum quick links
Baseline systems modeling requirements
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello!
I'm having some doubts regarding how to model the baseline (BB) building.
When modelling a baseline system (system #5 - VAV):
1) -
Diferent product references of one of several brands in same EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ricardo Sá on
Hi All,
According to LEED BD+C_V4 “EPD type III (specific product) it counts as one single product.”.
Airport projects now have space type options available in LEED Online
posted by Ricardo Sá on
According to USGBC, Airport projects now have space type options available in LEED Online.
Airport projects - LEED NC-v4: LT c4 Surrounding density and diverse uses
NC-v4 LTc4:Surrounding density and diverse usesposted by Ricardo Sá on
Dear All,
we are working in a project of a new airport pursuing LEED certification, and our clients asked us to perform a preliminary evaluation of the potential LEED score.
Airport projects now have space type options available in LEED Online
posted by Ricardo Sá on
Dear All,
Minimum energy performance calculator v4 - Peak demand
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have a doubt related with the Minimum Energy Performance Calculator for v4.
Room Geometry Adjustment - Baseline Lighting Power Increase
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi,
When modeling the Baseline's lighting power using the Space-by-Space method, may I icrease the Baseline's power by section 9.6.3 (Room Geometry Adjustment) by 20% ( if applicable)?