Forum quick links
Certification Process
posted by Luisa Scambia on
Hello LEEDUsers,
Could you kindly confirm that my understanding of the LEED certification process/duration is correct:
Rating System Selection
posted by Gloria Rozzini on
Good morning everyone,
"ready for review" status in Design Final Review Decision
CS-2009 IDc2:LEED Accredited Professionalposted by sofia la cognata on
Good Morning,
Purchase green power contract for core and shell
CS-v4 EAc7:Green power and carbon offsetsposted by Vincenzo Giacalone Biondo on
Hello everyone,
Mandatory MERV 11 or higher filters in existing building
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
The credit requests confirmation that the project has MERV 11 or higher filters (if project is in nonattainment area for PM2.5). Is this request mandatory in existing buildings as well?
piezometric tower as alternative water sources
CS-v4 WEc2:Indoor water use reductionposted by Gloria Rozzini on
hello everyone. In one of our projects we have a piezomentric tower previously used as a process water.
Rainwater Collected for Irrigation
NC-v4 SSc4:Rainwater managementposted by Andrea Valentini on
Hi all, I am working on a project where the rainwater is partially collected on site in a tank to be used for irrigation purposes.
glare-control devices for C&S
CS-v4.1 EQc4:Daylightposted by Francesco Passerini on
Hello, the reference guide states: "Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces".
ventilation of unconditioned warehouse
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
Is the ventilation of a unconditioned warehouse considered process energy?
Condenser heat recovery pump
Healthcare-v2009 EAc1:Optimize energy performanceposted by Davide Liviero on
Hello everyone,