Forum quick links
demolition of existing facade
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
Some years ago the facade of an existing building was demolished. The facade was completely glazed. The structure of the building (pillars, beams) was conserved.
Energy Performance : Automated Lightning and HVAC system
NC-2009 EAc1:Optimize Energy Performanceposted by Marco Valerio Ceccotti on
We Desined a Dormitory Building ( NC ) already constructed and in operation. Each door of the bedrooms has a card reader connected to a BMS ( Building Management System ).
System Fan Power for System 8 VAV with PFP boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Hi everyone, I have to model system fan power in VAV with PFP boxes in accordance with Table G3.1.2.9 ASHRAE 90.1 2007. I calculate the system fan power with value of supply air (value calculated b
Equipment Capacities
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
I am working on simulation with Carrier's HAP. I have to model baseline system 8 (VAV with PFB boxes) in accordance to ASHRAE 90.1 Appendix G 2007.
Dehumidification + reheat
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the designed AHU a cooling coil operates also in order to control the humidity ratio.
LEED NC or LEED for Healthcare?
posted by Elisa Sirombo on
Dear All, We are working on a project located in Italy, which would pursue the LEED certification under a 2009 version and we are wondering about the most appropriate rating system to use. The pr
Ventilation for parking garage
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I have a question about a project under LEED certification. We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to an office bui
SS Cr 2 1/2 mile radius
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Elena Gonzi on
Good morning, we have an area with 4 building. We are certifying each building with a different certification (3 New construction and 1 Commercial interior).
Material and Resources Collection Area
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Elena Gonzi on
Good Morning, We have a question about the area of storage. We have an area with 4 buildings. Each building has a separate certification.
Concrete and steel - first point 10%
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by LEEDme Lorenzi on
Good morning, I write to ask your opinion regarding the phrase at the beginning of the credit "If concrete or steel structural elements are applied toward this credit, the project must include at l