Baseline: existing heat pumps, new FCs

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

I'm modeling a commercial building that has 7 conditioned floors and is heated and cooled by 3 electric heat pumps. According to TABLE G3.1.1A the baseline model should be a System 8.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jun 15, 2018, 4:12 pm

waste rooms

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.

1
Thu Jun 7, 2018, 1:57 pm

waste rooms

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.

1
Thu Jun 7, 2018, 1:05 pm

Removed windows

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

In a building that is being refurbished some windows are removed and are replaced with opaque panels. How shall they be considered in the baseline model?

1
Tue May 29, 2018, 2:37 pm

rating system selection

LEED Rating System Selection
posted by  Sandro Paglia  on 

Good afternoon, we're certifying a building that is 10% retail, 10% offices and 80% residential.

3
LEED for Homes Techincal Development
US Green Building Council
LEEDuser Expert
38 thumbs up
Wed May 16, 2018, 8:03 pm

Floor area Ratio (FAR) calculation for Zero Lot Line Projects

NC-v4 SSc4:Rainwater management
posted by  Andrea Costa  on 

Dear all,

Please, could someone explain me in further detail how to proceed with the FAR calculation? 

0

Losses through tank in HW loop

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

ASHRAE 90.1 states:

G3.1.3.6 Piping Losses losses shall not be modeled in either the proposed or baseline
building designs for hot water, chilled water, or steam piping.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 24, 2018, 5:42 am

Harvesting storm water on a zero-lot-line project and discharging in a nearby canal

CS-v4 SSc4:Rainwater management
posted by  Costanza Della Torre  on 

Dear all,

I am not quite sure the approach we're using in a zero lot line project is correct to achieve this credit and would like to have your opinion.

1
Thu Apr 12, 2018, 8:13 pm

Selection of SHW system for baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

In the proposed system service hot water is heated in a water tank that is heated by a hot water loop that is connected with a gas boiler.

1
Thu Apr 12, 2018, 2:49 pm

Requirements of section 5.4.3.4 of ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  Maurizio Sabatino Pirocchi  on 

Hi,

I have a question concerning  requirements of section 5.4.3.4 of ASHRAE 90.1-2007.

1
Tue Apr 10, 2018, 3:33 pm