The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite. It seems that waste rooms (spaces for storage and collection of recyclables) are not included in the technical standard EN 15251 but air extraction is necessary there. Should it modelled in the same way (some air flow rates and some electrical power) in the design and in the proposed model?
Best Regards
Francesco Passerini
engineer90 thumbs up
June 7, 2018 - 9:05 am
This discussion has been copied in EAp2:
https://leeduser.buildinggreen.com/forum/waste-rooms-0