When is the building considered occupied?
NC-2009 EAc3:Enhanced Commissioningposted by Lise Dannesboe on
Hi. For the 10 month post-occupancy commissioning - when is the post-occupancy considered started. When all occupants (100%) have moved into the house and all equipment is up and running?
Painting
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Lise Dannesboe on
Hi - is it possible to paint the pavement to get the wanted SRI-value for the non-roof? And is there any specific requirements for such a paint?
BR, Lise
Distance between bicycle storage and bicycle network
NC-v4 LTc6:Bicycle facilitiesposted by Lise Dannesboe on
Hi.
"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter) walking distance or bicycling distance from a bicycle network"
Labelling of waste containers
NC-v4 MRp2:Construction and demolition waste management planningposted by Lise Dannesboe on
Hi.
Is inputting meters in the Whole Building model a MBCx requirement?
NC-v4 EAc1:Enhanced commissioningposted by Lise Dannesboe on
Hi.
Use of Whole Building model to predict the energy consumption for each meter
NC-v4 EAc3:Advanced energy meteringposted by Lise Dannesboe on
Hi.
Hope some can help.
Space usage type - kitchen
CS-2009 PIf3:Occupant and Usage Dataposted by Thomas Baltsersen on
We got a comment back from preliminery review regarding kitchen in an office building. We defined these Spaces as retail general which apparently was incorrect.
Pilot - option 1 - EPD
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Lise Dannesboe on
Hi.
Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?