Forum quick links
Providing private buses
NC-v4 LTc5:Access to quality transitposted by Hanh Truong on
LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th
Incomplete spaces for solar panel and future process load
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.
Controllability of lighting in Shared Area
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Mak on
We are having a hotel project that would like to attempt this credit.
Energy Simulation Baseline
CS-2009 EAc1:Optimize Energy Performanceposted by Yong Lee Low on
Hi, I am working on a office building of about 15,000sqm using AHU with underfloor system.
Factory with a high unregulated energy loads- LEED EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Hello, I am a beginner in LEED. I have a question regarding to EAp2. I am recently preparing LEED certificate report for a factory.
Local Code Requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Yong Lee Low on
LEED indicates that "Projects outside the U.S.
Finished surface of structural wall?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks!
requirements for secure bicycle storage?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Erin Holdenried on
Are racks or bike stands needed? I have a project with a designated area for bicycle storage.
Finishing coating on steel surface
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, my project plans to use 2 coating layers for steel frame structure of façade system, onsite and indoor.
shop applied adhesive in a laminate flooring
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Melissa Merryweather on
Our product uses a laminated flooring product. If the laminating adhesive and the finish product are both factory- applied, then do we need VOC tests?