Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1:Optimize Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to get the maximum 19 credit points in EAc1.

1
Wed Aug 31, 2016, 3:45 pm

Number of transients for FTE calculation

Calculating FTEs
posted by  Sunanda Swain, LEED AP BD+C, PQP  on 

Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.

1
Fri Sep 26, 2014, 12:46 pm

LEED EBOM

LEED Rating System Selection
posted by  Srimannarayana NCVK  on 

Hi, We are working on a project in Dubai. The building is 55% office and 45% hotel.

1
Sun Dec 7, 2014, 10:37 pm

EAc1 Credits Using DES Option 1 + A lot of Renewables

NC-2009 EAp2:Minimum Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.

1
Tue Aug 16, 2016, 4:18 pm

Minimum Indoor Air Quality Performance Calculation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Amal Venugopal  on 

My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,

1
Thu Aug 31, 2017, 6:23 pm

Single family homes - compliance with Energy Star and Checklists

ND-v2009 GIBp2:Minimum building energy efficiency
posted by  Mahesh M  on 

We are evaluating the possibility of pursuing LEED ND for a development in the middle east. The project consists predominantly of single family and low-rise residential units.

1
Mon Nov 30, 2015, 5:02 pm

Mechanical Equipment Finishes

NC-v4 EQc2:Low emitting materials
posted by  Samer Alhmdan  on 

Hello, Does this credit apply to the Mechanical Equipment Finishes ( Flooring, and Walling) for example Lifts finishes.

1
Tue Sep 12, 2017, 5:48 pm

DEC - EBOM

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  babu rajendran  on 

My project getting chilled water from District energy center which has cooling towers.

1
Wed Dec 10, 2014, 5:35 pm

Rating system for an Existing Office space

LEED Rating System Selection
posted by  Shijo John  on 

Dear All, We have an existing office (around 2-3 years old) which we want to get LEED certified. However, it is a part (tenant space) of mixed-use building.

1
Sun Apr 10, 2016, 11:58 am

CoC number not mentioned on Invoice

NC-2009 MRc7:Certified Wood
posted by  Deepika Parmar  on 

Hi, For our project the Invoices donot mention the CoC number.

1
Thu May 21, 2015, 6:39 pm