Forum quick links
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
Number of transients for FTE calculation
posted by Sunanda Swain, LEED AP BD+C, PQP on
Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.
LEED EBOM
posted by Srimannarayana NCVK on
Hi, We are working on a project in Dubai. The building is 55% office and 45% hotel.
EAc1 Credits Using DES Option 1 + A lot of Renewables
NC-2009 EAp2:Minimum Energy Performanceposted by Reniel Barroso on
We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.
Minimum Indoor Air Quality Performance Calculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,
Single family homes - compliance with Energy Star and Checklists
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Mahesh M on
We are evaluating the possibility of pursuing LEED ND for a development in the middle east. The project consists predominantly of single family and low-rise residential units.
Mechanical Equipment Finishes
NC-v4 EQc2:Low emitting materialsposted by Samer Alhmdan on
Hello, Does this credit apply to the Mechanical Equipment Finishes ( Flooring, and Walling) for example Lifts finishes.
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Rating system for an Existing Office space
posted by Shijo John on
Dear All, We have an existing office (around 2-3 years old) which we want to get LEED certified. However, it is a part (tenant space) of mixed-use building.
CoC number not mentioned on Invoice
NC-2009 MRc7:Certified Woodposted by Deepika Parmar on
Hi, For our project the Invoices donot mention the CoC number.