NC-v4 EQc9:Acoustic performanceposted by O Moltay on
Hi, we have a museum project with general exhibition areas: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide?
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater design - quantity controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
Regularly Occupied Space Area Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by ESRA OZKONUKSEVER on
Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
International Project Epa CGP
NC-2009 SSp1:Construction activity pollution preventionposted by ESRA OZKONUKSEVER on
Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
the documentation language
NC-2009 SSc1:Site selectionposted by ESRA OZKONUKSEVER on
hi everyone, working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language.
Natural Ventilation Loads Modeling
NC-2009 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.
Proposed case outside airflow rates
NC-2009 EAp2:Minimum energy performanceposted by Cagril Comert on
Hi, Our office building is ventilated with a constant volume AHU and conditioned by VRF system. AHU supplies 100% fresh air to the spaces, while VRF system provides heating and cooling.
Technical service building - Healthcare v2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jonathan Landry on
Hello fellow LEED experts, my client is confused on wether or not their services buildings has to be include in the current certification or could be certificated separately.