Forum quick links
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.
Confidential space
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.
Stormwater not going to municipal infrastructure
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michael Wahjudi on
We have site that is located about 600m from the sea, hence the stormwater will be discharged to the sea instead going to municipal infrastructure.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
Active freight rail
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Yong Lee Low on
Hi, in my country, we do not have freight rail (or railway to transport cargo from my understanding). We only transport cargo by ship or by plane.
Is Green Tag certification accpetable
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Shuchita Gupta on
Hi , I wanted to know if green tag ( an Australian rating ) acceptable instead of BIFMA / GREENGUARD , a furniture manufacturer which has greentag is claiming to us that LEED accepts this . Thank
Reclaim land for more than 40 years
NC-v4 MPR1:Must be in a permanent location on existing landposted by Michael Wahjudi on
"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
Campus Thermal Energy Plant Submission
posted by Michael Wahjudi on
Hi. We have LEED Campus Development with 2 LEED projects inside. Let's call it "Development F" and "Development A".
Using Chilled Water Pump similar to ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Wahjudi on
Hi, we have development where the Chiller Plant is serving three buildings.