Forum quick links
Clarification for Saudi Arabia regional priority credit
NC-2009 MRc2:Construction Waste Managementposted by Daoud Akeileh on
The MRc2: Construction waste management credit is a regional priority credit in UAE one of the Saudi Arabian country eastern boundary and the Saudi Arabia is not one of the listed countries for reg
IEQc6.1 - space type category
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by S. Sachs on
For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category?
Preferred Parking and LEED Interpretation 10202
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Saud Abdul Rasheed on
Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.
EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSA
Schools-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1.
Submetering - Core & Shell 2009
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Mohammad Haj-Ali on
We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building.
Fire suppression systems
NC-v4 EAc6:Enhanced refrigerant managementposted by Jody Lee Potvin-Jones on
Hi, Are fire suppression systems and their OPD and GWP addressed by this credit?
Calculation for Design Energy Cost
CS-2009 EAc6:Green Powerposted by Saud Abdul Rasheed on
Dear All, We want to buy RECS for our project but I am confused about the quantity to buy. We performed an energy model and the total electricity demand for the project is 4,000,000 kWh.
Sensor based lavatory faucet compliance
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Faisal on
Hi, How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is EAF-200-P-