Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Clarification for Saudi Arabia regional priority credit

NC-2009 MRc2:Construction Waste Management
posted by  Daoud Akeileh  on 

The MRc2: Construction waste management credit is a regional priority credit in UAE one of the Saudi Arabian country eastern boundary and the Saudi Arabia is not one of the listed countries for reg

2
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
LEEDuser Basic Member
10 thumbs up
Wed Nov 11, 2015, 5:05 pm

IEQc6.1 - space type category

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  S. Sachs  on 

For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category?

3
Thu Nov 5, 2015, 3:21 am

Preferred Parking and LEED Interpretation 10202

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Saud Abdul Rasheed  on 

Hi all, We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient Vehicles.

2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Sat Oct 24, 2015, 6:46 am

EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSA

Schools-2009 EAp2:Minimum Energy Performance
posted by  VEL MUTHU  on 

Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Sep 19, 2015, 9:00 am

Submetering - Core & Shell 2009

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Mohammad Haj-Ali  on 

We're designing an office building that the owner wants to provide flexibility in leasing, such that tenants can rent certain spaces in the floor, whole floors, or the whole building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 14, 2015, 1:06 pm

Fire suppression systems

NC-v4 EAc6:Enhanced refrigerant management
posted by  Jody Lee Potvin-Jones  on 

Hi, Are fire suppression systems and their OPD and GWP addressed by this credit?

3
Default Avatar
engineering manager
javac
LEEDuser Basic Member
0 thumbs up
Tue Apr 28, 2015, 8:39 pm

Calculation for Design Energy Cost

CS-2009 EAc6:Green Power
posted by  Saud Abdul Rasheed  on 

Dear All, We want to buy RECS for our project but I am confused about the quantity to buy. We performed an energy model and the total electricity demand for the project is 4,000,000 kWh.

5
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
LEEDuser Basic Member
10 thumbs up
Wed Feb 4, 2015, 10:02 pm

Sensor based lavatory faucet compliance

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by   Faisal   on 

Hi, How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is EAF-200-P-

4
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Fri Dec 12, 2014, 3:05 pm