FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

Schools-2009 EAp2:Minimum Energy Performance

EPA TARGET FINDER RATING TOOL FOR A SCHOOL PROJECT IN KSA

Hi, I am currently working on a school project located in KSA. we are about to start the EA P2 and C1. I found that, it is a requirement to establish energy rating goal using EPA's target finder rating tool to meet the EA P2. Help me decide whether it is really required to do this target finder exercise for projects outside use i.e. a school project in Kingdom of Saudi Arabia. i believe this energy star rating will well suit and widely recognised and used in the states of US not for other countries where they have their own rating for equipment. Also the results will not be reliable due to afore said reasons. Please clarify and thanks for your time. Vel

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 09/15/2015 - 19:32

International projects are exempt from this requirement.

Wed, 09/16/2015 - 04:34

Thanks Marcus for your prompt reply. I am curious to know whether this is cited anywhere in any of the documents. If you provide any details of such document I will use that as supporting document to justify not using or submitting the results from EPA target finder tool. I searched but not able to get any such document. Thanks Vel

Fri, 09/18/2015 - 14:32

If you use the latest version (v5) of the EAp2 form it says that projects outside the US are not eligible for a Target Finder score. https://www.leedonline.com/irj/go/km/docs/documents/usgbc/leed/content/CreditFormsDownload/V05/nc/ea/eap2/eap2_sta.pdf

Sat, 09/19/2015 - 09:00

Thank you Marcus, I did not check this so why this confusion. Thanks for your information.

Add new comment