Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

VRV that controls laboratory ambient temperature should be classified as HVAC system or process

NC-v4 EAp2:Minimum energy performance
posted by  SOLON YANG  on 

I encountered this situation when building the energy model: the laboratory's ambient temperature control was provided by VRV, which was closed, mainly for equipment testing, and the personnel

7
Delta Electronics
LEEDuser Basic Member
0 thumbs up
Fri Jul 20, 2018, 2:51 pm

Diverse uses - Shops in a shopping mall as tenants

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Megumi Horii  on 

Can shops in a shopping mall as tenants be counted seperately or as "several shops in 1 shopping mall = 1 shop"?

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Tue Jul 17, 2018, 12:48 am

Cooling Tower drift eliminator - standards for processes

NC-v4 WEp2:Indoor water use reduction
posted by  Dionisio Franca  on 

We checked the drift eliminator specs with the manufacturer selected for our project and they told us that that their draft eliminators reduce drift to 0.05% only.

0

Quick EV charger

NC-v4 LTc8:Green vehicles
posted by  Noriko Nagazumi  on 

Hello, We understand that EV charger with capacity to make a car full charged in 8 hours could be counted as one under v2009, so quick charger which has capacity of charging a car to full in 2 hou

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Jul 2, 2018, 5:20 am

4VOC certification

CI-v4 EQc2:Low emitting materials
posted by  DAVE LI  on 

Japan has a Third Party certification called 4 VOC.
This certification carries out relevant tests on Toluene, xylene, ethylbenzene, and styrene, and sets benchmark values.

0

What is the base building service water?

CI-v4 EAc3:Advanced energy metering
posted by  JASON NIEN  on 

In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to base building service water, thanks advance.

1
Thu Mar 8, 2018, 4:50 pm
2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Feb 21, 2018, 12:24 am

LEED ND v4 MPR2 project area

ND-v4 MPR2:Must use reasonable LEED boundaries
posted by  wenting ding  on 

We are considering applying for a LEED ND cergification.

0

Railway station

ND-v2009 NPDc7:Transit facilities
posted by  Noriko Nagazumi  on 

Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.

1
Fri Aug 18, 2017, 3:30 pm