Forum quick links
Green pavers
CS-2009 SSc5.2:Site development - maximize open spaceposted by jesmin joseph on
Can green/grass pavers comply towards maximum open space credit? Can we consider 25% percentage of grass paver area as vegetated area and other 75% as pedestrian oriented hardscape area? Please a
Datacentre Requirements
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Priyadarsi Das on
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating.
prescriptive efficiency requirements ABCPG section 2.9
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Rahul Yadav on
Hi We are doing a LEED CI project in India. The scope of the project includes only AHU , ducting and HRW from the HVAC side.
EA Prerequisite 2
CI-2009 EAp2:Minimum energy performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal comfort - designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con
Site Management Policy but No Landscaping
EBOM-v4 SSp1:Site management policyposted by Nitesh Kumar J on
I'm looking for some guidance regarding Site management policy. There is no scope of landscaping or soil in the existing site, then how do we attempt this prerequisite.
compliance for naturally ventilated spaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Poorva Keskar on
Referring to the FAQs fan-assisted ventilation in naturally ventilated spaces can be considered as mechanical ventilation.
Multiple AHU's serving one zone
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Lavanya Veerappa on
Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.
Shuttle Services
NC-v4 LTc5:Access to quality transitposted by sriram tetali on
Dear All can any one suggest whether we can claim the Shuttle services provided by client in the LTc4 or LTc5 credits in LEED v4 NC Rating system Thanks & Regards sriram
Well for condos !
posted by H Agarwal on
As the everything starts from top and gradually bottoms down. I wish Well for individual homes could be available .