My building has four floors, and 4th flr is left empty for future use.
Data Center Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Wei Jiang on
Dear all, We are trying to calculate the IT & electricial energy consumption of a data center, using the Minimum Energy Performance Data Center Calculator.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.
Historic site
CS-v4 LTc3:High priority siteposted by Jie Xiong on
Hi I am new to V4. There is a question about this credit. On the RG, page 75 further explanation, says that "project may......indicates has significant historic or cultural value".
PAUs not serve the occupied areas
NC-2009 IEQp1:Minimum IAQ Performanceposted by study topenergy on
A data center is applying for LEED-NC v2009. There are 5 PAUs (Primary Air Unit). 4 of them will serve the equipment rooms. One will serve the equipement rooms and office areas.
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
Questions on ASE and sDA assessment area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions on option 1 in EQ credit-Daylight? A) Assuming a project go for option 1 in EQ credit Daylight.
energy-saving target during construction
CS-2009 IDc1:Innovation in Designposted by Dee Yun on
Hi, I have a project that has energy-saving target during the construction phase.
Is this items means?
posted by shize zhang on
Is this item means onlly a building certified by ISO 50001 can apply for 1 credit in EA? Then how to apply for ACP? Thanks.