Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

SRI Value for concerete

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  soha yamani  on 

Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part

1
Thu Nov 26, 2015, 10:32 pm

Trucks

NC-v4 LTc7:Reduced parking footprint
posted by  Tarek   on 

In a warehouse Project, for determining the actual parking capacity of the project, are the Trucks counting in the parking spaces ?

1
Wed Mar 29, 2017, 2:53 pm

Covered bicycle racks for dormitories building in a university

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  soha yamani  on 

I am working on a university campus project which includes over twelve buildings and a dormitories building, now regarding SSC4.2 credit we have provided the required number of bicycle racks for ea

5
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Tue Jan 31, 2017, 6:46 pm

Platted Lots by Government

NC-v4 LTc2:Sensitive land protection
posted by  soha yamani  on 

Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?

3
Senior Sustainability Engineer
Metec Consultants
LEEDuser Basic Member
12 thumbs up
Mon Jan 23, 2017, 8:16 pm

VOC product category

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  soha yamani  on 

we are trying to identify a product to check its VOC limit, however, the supplier identified the product as Prefabricated Architectural Multi- Component and touch up from RULE 1107.

2
Tue Aug 9, 2016, 10:52 pm

Signed Contract with the CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Mohamed M. Abd Elhameed  on 

We are pursuing LEED Certification for a 476921.20 sq ft Mixed Use Office Building in Egypt.

5
CEO & Founder
The Construction Green Team
LEEDuser Basic Member
0 thumbs up
Thu Jun 30, 2016, 8:51 pm

Maximum Temperature

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Omar Elrawy  on 

Dear All, I need to ensure that in the 60/60 rule, I do not find anything about the maximum indoor temperature during flush-out, please advice if I can maintain any indoor temperature as long as it

3
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Thu May 12, 2016, 12:21 pm

Hard-Lid Ceiling

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Omar Elrawy  on 

Dear all, I need to know exactly what fulfills the "Hard-lid" ceiling?.

13
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Nov 11, 2014, 12:48 pm

No New Wood

NC-2009 MRc7:Certified Wood
posted by  Omar Elrawy  on 

Dear all, I actually have two questions; the first is that I have a wood product with only pre-consumer recycled content, I need just to confirm that this product is exempt from this c

3
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Thu Sep 25, 2014, 3:53 pm