Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

opaque building envelope construction

NC-v4 EAp2:Minimum energy performance
posted by  Ahmed El-Semary  on 

i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??

6
Mon Sep 18, 2017, 1:25 pm

Campus for a gated residential/commercial compound versus ND

LEED Guidance for Campuses and Multiple Buildings
posted by  ABDELHAMID BESHARA  on 

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.

1
Sat Apr 30, 2016, 4:23 pm

voc for Damp proofing paints under ground

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  soha yamani  on 

Hi all , do damp proofing paints that are used to paint concrete foundations, retaining walls, and column necks are considered inside the building ?

1
Sat Jul 2, 2016, 4:44 pm

Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Aly Adel  on 

Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).

1
Fri Nov 27, 2015, 3:46 am

Campus approach in a gated residential compound or ND?

LEED Rating System Selection
posted by  ABDELHAMID BESHARA  on 

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.

1
Mon Apr 11, 2016, 3:21 pm

Separating Pantry Zone

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear all, I have a case where I need to know if I should model separate Pantry zone in Both Basecase and Proposed Case, or in Basecase only? I have an office building with one System 8

1
Wed Dec 3, 2014, 4:26 pm

Concerning Signatories

NC-2009 EAc3:Enhanced Commissioning
posted by  Omar Elrawy  on 

I need to know if the two signatories on the EA CREDIT 3: ENHANCED COMMISSIONING - LEEDOnline form are to be signed by the CxA, or by the owner?

1
Mon Jan 30, 2017, 10:55 pm

Shipping Room

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Omar Elrawy  on 

Dear All, We have a shipping room in our office NC building. The room has 11 lockers, each locker has a chair for 1 occupant.

1
Wed Jan 6, 2016, 6:48 pm

Concerning Underground Basements

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Omar Elrawy  on 

Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I

1
Wed Nov 11, 2015, 8:56 pm

Report Contents

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Omar Elrawy  on 

Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room.

0