Forum quick links
Dehumidification + reheat
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the designed AHU a cooling coil operates also in order to control the humidity ratio.
LEED NC or LEED for Healthcare?
posted by Elisa Sirombo on
Dear All, We are working on a project located in Italy, which would pursue the LEED certification under a 2009 version and we are wondering about the most appropriate rating system to use. The pr
Ventilation for parking garage
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I have a question about a project under LEED certification. We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to an office bui
SS Cr 2 1/2 mile radius
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Elena Gonzi on
Good morning, we have an area with 4 building. We are certifying each building with a different certification (3 New construction and 1 Commercial interior).
Material and Resources Collection Area
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Elena Gonzi on
Good Morning, We have a question about the area of storage. We have an area with 4 buildings. Each building has a separate certification.
Concrete and steel - first point 10%
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by LEEDme Lorenzi on
Good morning, I write to ask your opinion regarding the phrase at the beginning of the credit "If concrete or steel structural elements are applied toward this credit, the project must include at l
Reserved parking on existingcampus parking area outside building
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by LEEDme Lorenzi on
We have a new office project inside a campus, there is an existing big parking area serving the campus not adiacent to the building, no parking are allocated inside our LEED boundary and not new pa
small DES
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a preliminary review I modeled a building that is heated and cooled by four geothermal heat pumps that are located in a technical room within the building.
2 Buildings in a unique Hotel
NC-2009 EAp2:Minimum Energy Performanceposted by Antonio Marquez Briones on
We have one unique boiler, that feeds two buildings inside the LEED boundary of the hotel. Must we do two energy models, with two set of input/output reports?
Interior or Exterior Lighting fixture in residential project
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
We are developing a building energy modeling of a residential building based on 90.1-2007. The dwelling units have exterior areas (balconies) that have luminaires. These luminaires have to be mod