Forum quick links
Heat recovery and dehumidification
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In a swimming pool removing latent heat is necessary all the year round. For the baseline model, if I model the heat recovery according to G3.1.2.10 Exhaust Air Energy Recovery (50% both sensible a
Simulation. Warehouse. Fixed high racks, occupied.
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Candice Clark on
For a warehouse, can I deduct the permanently fixed high racking coverage area from the gross floor area, and focus my 75% daylight coverage on the aisles and landing spaces only? I say yes.
Volume boundary in CFD calculations
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by VICTOR MORENO on
Hi, to perform CFD model for IEQc5-LEED Healthcare. What is the size of the model boundary in exterior CFD calculations? That is to say, What area (m2) around the hospital we have to model?. Than
n/a
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maria Rios on
Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m
LEED v4 rating systems being translated to Portuguese
posted by Tristan Roberts on
USGBC is translating the LEED v4 rating systems to Chinese, Portuguese, and Spanish, and they passed us an advance copy to get your feedback!
Baseline HVAC System Type - for laboratories
NC-v4 EAp2:Minimum energy performanceposted by Carol SR on
Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a
Continuous Monitoring Sensors
EBOM-v4 EQc3:Thermal comfortposted by Laura Danzig on
Hi there, a quick question regarding the locations of the sensors/measurements required for this credit.
Error in eQUEST in the Perform Compliance Analysis
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, I am stuck with an error from eQUEST.
Integrative Process-Simple box C&S v4
CS-v4 IPc1:Integrative processposted by Giuseppina Amorusi on
Hi all, I and my team are working on LEED v4 BD+C project, and we're looking to pursue the Integrative Process credit for Core and Shell certification. We have an existing building where we will do
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).