Forum quick links
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Additional Enhanced IAQ Strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Marina Curto on
In this credit, two options are available, Options 1 and 2. Can a project achieve Option 2 only without pursuing Option 1?
WEp1 calculator gender
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by VICTOR MORENO on
In v2009 WEp1 calculator, the toilet is divided by gender (male and female. If the % male-female is 50%-50%, it might point to 50% in "percent of occupants" cell each.
Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Mercè Llorca on
There are outside works planned to be done.
Existing Building Flooring Reuse
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the reused flooring be exempt from the credit requirements and should only new flooring to be installed comply with the requirements in order t
Daylight and quality views measurement in a special building
EBOM-v4 EQc5:Daylight and quality viewsposted by Ana Villarroya on
We're working on a case of a building complex that aims to achieve a LEED certification within some years. The complex is a sanctuary, and it includes several hospitality buildings and a shrine.
10 existing villas project
posted by Adamantia Zisopoulou on
My project is an existing sea resort complex which consists of 10 villas with kitchens. Which LEED rating system can I use?
WE_Cr1 "Outdoor Water Use Reduction": Installation of a well
NC-v4 WEc1:Outdoor water use reductionposted by Francesco Passerini on
Is it possible to install a well specifically to collect groundwater for irrigation to meet the intent of the credit to reduce potable water use for irrigation?
Reducing Volume of stormwater runoff through 2 improvements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by VICTOR MORENO on
Hello, Our project is based on the case 2.
Cooler and freezer storage
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mercè Llorca on
Hello, We are working on a project that is a combination of offices and food production.