Wed Jun 13, 2018, 5:06 pm

waste rooms

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.

1
Thu Jun 7, 2018, 1:57 pm

waste rooms

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.

1
Thu Jun 7, 2018, 1:05 pm

BUG method based on angle of mounting

NC-v4 SSc6:Light pollution reduction
posted by  sladjana pandurovic  on 

Does the angle of installation of the lamp influences its BUG rating?

1
Fri Jun 1, 2018, 2:22 pm

Removed windows

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

In a building that is being refurbished some windows are removed and are replaced with opaque panels. How shall they be considered in the baseline model?

1
Tue May 29, 2018, 2:37 pm

Room Geometry Adjustment - Baseline Lighting Power Increase

NC-v4 EAp2:Minimum energy performance
posted by  Luis Andrade  on 

Hi,

When modeling the Baseline's lighting power using the Space-by-Space method, may I icrease the Baseline's power by section 9.6.3 (Room Geometry Adjustment) by 20% ( if applicable)?

1
Thu May 24, 2018, 1:44 pm

rating system selection

LEED Rating System Selection
posted by  Sandro Paglia  on 

Good afternoon, we're certifying a building that is 10% retail, 10% offices and 80% residential.

3
LEED for Homes Techincal Development
US Green Building Council
LEEDuser Expert
38 thumbs up
Wed May 16, 2018, 8:03 pm

Easily Achieved

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Emmanuel Pauwels  on 

We applied this credit in our Project in Athens in Greece and had no difficulty achieving it.

0

Changing rooms in adjacent LEED building

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Instra Ingenieros  on 

We have a project with an existing LEED adjacent building to the new LEED building. Both buildings are conected by the interior and the exterior and owned by the same landlord.

8
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Apr 30, 2018, 4:25 pm

Floor area Ratio (FAR) calculation for Zero Lot Line Projects

NC-v4 SSc4:Rainwater management
posted by  Andrea Costa  on 

Dear all,

Please, could someone explain me in further detail how to proceed with the FAR calculation? 