Calculator Points clarification
Pilot-Credits MRpc102:Legal Woodposted by Patrice McVeigh on
Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.
Akvifer
NC-v4 EAc5:Renewable energy productionposted by Sara Johansson on
Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.
ASHREA audit though newly renovated
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Mathilda Jonsson on
Hello Five years ago my project building were LEED EB:OM certified and now with new tenants and a renovation taken place we are recertifying.
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!
Primer Sealer VOC Content
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jordan Kirrane on
I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.
CI in a CS project
CI-v4 LTc2:Surrounding density and diverse usesposted by Sara Johansson on
If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac
Option 2 Prescriptive Compliance EU labels for appliances
CI-v4 EAp2:Minimum energy performanceposted by Karen Elliott on
I know others have asked this but I cannot find any definitive guidance on how to relate for example a dishwasher with an EU energy rating to the Energy Star label.
Energy model for a version 4 project in a version 2009 project
CS-2009 EAp2:Minimum Energy Performanceposted by Mathilda Jonsson on
Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.
Solar panels serving another building
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Rasita Masalskyte on
If solar panels on our building‘s roof are serving another building‘s energy needs, can we still exclude these solar panels from calculations as mechanical equipment?