Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!
CI in a CS project
CI-v4 LTc2:Surrounding density and diverse usesposted by Sara Johansson on
If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac
Option 2 Prescriptive Compliance EU labels for appliances
CI-v4 EAp2:Minimum energy performanceposted by Karen Elliott on
I know others have asked this but I cannot find any definitive guidance on how to relate for example a dishwasher with an EU energy rating to the Energy Star label.
Energy model for a version 4 project in a version 2009 project
CS-2009 EAp2:Minimum Energy Performanceposted by Mathilda Jonsson on
Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.
Primer Sealer VOC Content
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jordan Kirrane on
I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.
Solar panels serving another building
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Rasita Masalskyte on
If solar panels on our building‘s roof are serving another building‘s energy needs, can we still exclude these solar panels from calculations as mechanical equipment?
Open parking under the building
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rasita Masalskyte on
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.
IEQp1 - LEED CI 2009
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hi, I have completed an offline (active) IEQp1 form which shows that pre-requisites are being met. When I complete the same form online, the result is that the pre-requisites are not being met.
Confused about credit title
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
Is MRpc52: A) "Material multi-attribute assessment", as stated under credit language or B) "Environmentally preferable non-structural products and materials: perscriptive attributes"