Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Switching between Options 1 and 2

CI-v4 EAc2:Optimize energy performance
posted by  Meike Borchers  on 

We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.

0

Discrepancy between credit requirements and credit specifics

Pilot-Credits MRpc52:Material multi-attribute assessment
posted by  Jody Lee Potvin-Jones  on 

I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro

1
Wed Apr 13, 2016, 9:14 pm

Water Use Reduction Calculator

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Susannah Goddard  on 

I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.

1
Fri Nov 27, 2015, 7:21 pm

Cycle network, paths?

NC-v4 LTc6:Bicycle facilities
posted by  Karen Elliott  on 

Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!

1
Thu Feb 25, 2016, 11:37 pm

Calculator Points clarification

Pilot-Credits MRpc102:Legal Wood
posted by  Patrice McVeigh  on 

Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.

0

Akvifer

NC-v4 EAc5:Renewable energy production
posted by  Sara Johansson  on 

Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.

1
Thu Nov 10, 2016, 4:51 pm

ASHREA audit though newly renovated

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Mathilda Jonsson  on 

Hello Five years ago my project building were LEED EB:OM certified and now with new tenants and a renovation taken place we are recertifying.

1
Wed Jan 28, 2015, 2:59 pm

Option 2 IAQ Testing - Schedule

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anne-Claire BARBERI  on 

Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.

1
Fri Jun 24, 2016, 9:52 am

Primer Sealer VOC Content

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jordan Kirrane  on 

I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.

1
Wed Jan 18, 2017, 1:58 pm

CI in a CS project

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Sara Johansson  on 

If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac

1
Fri Mar 31, 2017, 1:32 pm