Forum quick links
Tricky project - NC, C&S or EBOM?
posted by Maria Glädt on
Hi We have a eight storey office building that will undergo a larger Core and Shell refurbishment; windows will be changed, the building is u-shaped and the "interior courtyard will be enclosed b
Suburban achieving SSc2
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Martin Meehan on
The credit language states that projects in Urban areas achieving SSc2 can contribute with green roof/pedestrian oriented hardscape. Are projects in Suburban areas achieving SSc2 allowed to do so?
Showers?
CS-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Do the required number showers have to be placed together (near the bicycle racks) or can showers spread through-out the building be accounted for?
Lighting power allowance calculations for V4 ID+C Retail
Retail-CI-v4 EAp2:Minimum energy performanceposted by Joanna Peacock on
According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For
0% credit achievement rate?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Graham Langton on
I'm seeing the credit achievement rate as 0% for this credit. Other achievement rates seem OK. Has nobody achieved this credit? Can this be verified?
Can this credit be achieved if no minimum local code requirement
CI-v4 LTc5:Reduced parking footprintposted by Juliana Moreira on
I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces.
Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Maria Glädt on
See quotation from LEED-CI. "Use tenant renewable energy systems to offset the project’s energy cost.
Old sheet metal on roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Glädt on
Hi! The roof of our renovation project has is made of old sheet metal, which we do not know the SRI of.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
Service hot water pumps in the baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
I am doing an ASHRAE 90.1-2007 PRM analysis.