CI-v4 EAc2:Optimize energy performanceposted by Meike Borchers on
We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance.
Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro
Water Use Reduction Calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!
Calculator Points clarification
Pilot-Credits MRpc102:Legal Woodposted by Patrice McVeigh on
Can you clarify the number of points available for this ACP? I believe it is 1 but if in the Validation Tap all statements for the point allocations are 'True' then the figure comes to 2.
Akvifer
NC-v4 EAc5:Renewable energy productionposted by Sara Johansson on
Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.
ASHREA audit though newly renovated
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Mathilda Jonsson on
Hello Five years ago my project building were LEED EB:OM certified and now with new tenants and a renovation taken place we are recertifying.
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Primer Sealer VOC Content
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jordan Kirrane on
I have a water based primer sealer that the client is looking to use in order to fix artwork to the walls throughout their floors.
CI in a CS project
CI-v4 LTc2:Surrounding density and diverse usesposted by Sara Johansson on
If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac