Exemplary Performance Parking

CI-v4 INc1:Innovation
posted by  James Pack  on 

Can we achieve exemplary performance for Parking if we are acheiving credit by default due to no parking possible?

0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jun 22, 2020, 7:07 am

LEED EBOM v4 minimum occupancy requirements

EBOM-v4 EAp2:Minimum energy performance
posted by     on 

Hello,

Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified?

1
Tue Jun 16, 2020, 6:59 pm

ACP for Europe

CI-v4 EAp2:Minimum energy performance
posted by  Edwin van Eeckhoven  on 

Hello out there!

For a retail interior  project in Europe the question is, is there an ACP for the energy modelling (software) instead of ASHREA which is not common in EU.

3
Wed May 20, 2020, 2:13 pm

Both Option 1 & Option 2 achievable

NC-v4 LTc3:High priority site
posted by  Muge Karasahin  on 

Hello,

Our project site qualifies both for Option 1. Historic District and Option 2. Priority Designation of the credit. Is it possible to claim two points for this credit?

3
Mon May 4, 2020, 3:11 pm

Smoking on roof

CS-v4 EQp2:Environmental tobacco smoke control
posted by  Tobias Berge  on 

Do we need to prohibit smoking on the roof of a multi tenant office, hotell and retail building.

3
Department manager
Sweco
LEEDuser Basic Member
1 thumbs up
Mon Apr 27, 2020, 9:15 pm

If bare raised floor is covered with carpet - is it reused?

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Diana Nezamutinova  on 

1. In our fit-out project in London the base building provides raised access floor that cannot be used as is due to acoustic and aesthetic reasons.

3
Default Avatar
Senior Consultant
Arcadis
LEEDuser Basic Member
2 thumbs up
Mon Apr 27, 2020, 2:04 pm

Alternative Energy Performance Metric for Swedish project

Pilot-Credits EApc95:Alternative Energy Performance Metric
posted by  Pia Öhrling  on 

We are trying to pursue this credit since it better reflects our building performance than the cost-metric and it also gives us more Points.

2
Default Avatar
Bénefficience
LEEDuser Basic Member
1 thumbs up
Mon Apr 20, 2020, 12:55 pm

WE Prerequisite 1

EBOM-v4 WEp1:Indoor water use reduction
posted by  Alice Andersen  on 

I have a lavatory faucet that are automatically controlled (sensor control) and a flow rate of 5 l per minute. In accordance to the LEED manual the baseline is 1.9 l per minte.

0

Option 2 - Leadership Extraction Practices

CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sara Johansson  on 

How can structure and shell only be allowed to contribute towards 30% of the compliant building material cost, when 25% is enough to fullfil this credit?

8
Thu Mar 12, 2020, 12:34 pm